My WebLink
|
Help
|
About
|
Sign Out
Browse
202207472
LFImages
>
Deeds
>
Deeds By Year
>
2022
>
202207472
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2022 11:21:26 AM
Creation date
10/19/2022 11:15:55 AM
Metadata
Fields
Template:
DEEDS
Inst Number
202207472
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ROW CONSTRUCTION PROJECT NOTES <br />I The City shall be notified a minimum of furry eight (48) hours in advance of initial project construction. <br />12 If sidewalk. wheel chair ramps or any portion of the pedestrian facilities are removed or closed, a pedestrian detour shall be established <br />and maintained during the time of the closure and the entire pedestrian facility shall be restored within seventy-two (72) hours, unless the <br />2. The contractor shall adhere to the curtenl Cit) standard specifications, approved special prosisionr. City standard plan.. right-of-way conclroclion <br />procedures manual. <br />contractor provides a hard surface alternate route approved by the city. <br />13 AN pedestrian detours and any reconstruction of pedestrian facilities shall meet current Americans with Disabdtty Act (ADA) standards and <br />3. The locations of all aerial and underground utility facilities may not be indicated on the project plans. The contractor n required to contact the Um <br />5pecihcalan,. <br />Call N I 1 notification center (dial NII) forty eight (48) hours prior to working in the city nghl of way. No excavation will he permuted in the area of <br />the underground utilities until all lin:dines have been located and identified w the satisfaction of all panics. The contractor shall be responsible for <br />14. All pedestrian detours shaN be part of an approved Traffic Control Plan (TCP). <br />protection of all underground and aerial utilities and Infrastructure, <br />15. All hobs made in city pavements for the purpose of performing vacuum excavations to locale underground utilities shall be restored to <br />4. whenever underground facilities are in close proximity to the proposed pathway location or wh:nemer the vertical location of the underground <br />their original condition with the reinstated core flush with and in the original orientation as the existing surface matching existing pavement <br />taeiltly is unknown. the permitter shall use special measures to determine the locations of such underground facilities. <br />surface appearance. <br />a. If the permittee is conducting the excas 500n by digging Crum the surface, when an a close proximity to the underground facilities. the permutes <br />16. When the contractor is not actively working, all equipment, fencing. debris. els. shall no) be placed within the triangular area required for <br />shall use hand digging, hydro excavating, air excavating. or any other techniques that are approved by the City to locate such lucility. <br />sight distance of vehicles exiting or entering an adjacent property or intersection. <br />b. Tithe permittee is conducting the excavation by Tunneling or boring. the permute,: shall determine the metrical location o(the underground <br />facility by potholing or any other method approved by the City. <br />17 AN excavations shag be adequately fenced and covered when contractor is not present or project site left unattended. <br />5. Project plane shall dimension new facilities being installed. Measurements shall be taken from existing adjacent visible structures (curbs. poles. <br />18 No lane closures allowed on arterial streets during AM and PM peak hours unless approved by City Traffic and Right of Way Construction <br />cabinets, manholes, inlets. lin hydrants. tile.) clearly identifying location of such facility . The uonloaotor shall verify dimensions taken from city tiles. <br />section(s) staff. <br />o. Unless specified on the plan sets, the depth of installed facilities m city row shall be ata minimum as follows. <br />19. All work zone Traffic control. including pedestrian control measures, shall be to compliance with the MUTCD. ADA, and the City Standard <br />a. Thtsry-two 132) inches to soil, if rock present and is an issue twenty-four (24) inches can be rased. <br />Specifications. <br />20. The City shall be notified a minimum of Seventy Two (72) hours prior Io any lane or road closures. <br />b. Furey-Iwo (42) inches below a projected slope Goan the flow line of a ditch ata three (3) horizontal and one I I) semeal slope. <br />21. The contractor shall notify all affected owners of adjacent properties a minimum of forty-eight (48) hours prior to beginning of construction <br />c. Pony-eight (48) inches under a roadway tneasured horn the surface of said roadway to the top of the installation. <br />and provide updates to the affected owners when construction phases change that affect the areas of work associated with the permit. <br />d. Forty-eight (4N) inches under a stone water or creek channel design bottom of pipe. and <br />22. The contractor shall maintain a set of 'as built' plans on site with dimensioning. These plans shalt be presented uPon request to any 013 <br />representative. <br />e. Maintain a minimum of Twenty-tour (24) inches of eertteal and horizontal spacing horn existing utilities. <br />23. A current city right of way construction permit, a city approved plan set, and traffic control plan shal be maintained on each work site by <br />I . Be located as far from the existing or proposed curb Ione as possible to avoid potential fume conflicts. <br />the contractor. The contractor shall present such permit and plan set upon request to any city representative. <br />24. The contractor shall remove locale flags after work is complete. <br />7. All potholes to sidewalk panels will be tilled unless directed by City inspector. Bicolored. textured of patterned concrete is existing. replacement <br />patches, and panels panels will be replaced to match as practicable. Owner nay be required to put money into escrow To comer all repairs prior to <br />starting work. <br />25. Any field adjustments To installation of facilites, which vary from Me plans that have been submitted and approved during the permit <br />application process, shah comply with the following: <br />N. All non-street surface materials That are disturbed by excavation and backfilling operations shall be replaced and restored. <br />a. The contractor must slop work immediately and contract the facility owner. <br />9 City street surae materials disturbed shall be backfilled. tamped and rcpaved by city tones or approved paving contractor. <br />b. The (aciM owner's representative shall contact the city's construction inspector and provide dem with the details of the <br />proposed <br />changes <br />10. All Conduit. vaults and Pedestals shall be located in the public ROW and an public utility caseMe. <br />c The City inspector will make a determination on how to proceed. This determination may range from approval over the phone or viae <br />MINIMS IN sit esu <br />—_ <br />11. All Aerial shown on attached planet will be permitted separately by Pole 0000,, Alt pole pemuts submitted to pole owners will follow <br />mad to delaying the project until plans can be updated and appropriate review can be conducted. <br />NPR' codes. <br />26. Crossing City of Grand Island Traffic Signal Infrastructure <br />■■■■��r'■■■ <br />a. Conduit shall not be placed between City's Traffic Signal Cabinet and Connecting traffic signal Conduit and poles. If unable to route the <br />�WeFt <br />conduit around the City's Traffic Signal Cabinet and Connecting traffic signal Conduit and poles because of physical constraints, a <br />meeting will be held onsite with the contractor, city. and ALLO to determine the best conduit alignment between these structures <br />iota tocw'r'as'n" <br />ansn nufrotan°s,�en,� <br />WI... GUY TILMOOK <br />uaass 'eaoxn' <br />b. Conduit shall be offset a minimum of Five (5) feel from the base of any traffic signal cabinet, traffic signal pole, or traffic signal pull box. If9m <br />CMIDIV.111•0,11”.110,0.1.1, <br />Conduit cannot be offset a minimum of Five (5) feet from the base of any traffic signal cabinet. traffic signal pole. or traffic signal pull box <br />because of physical constraints. a meeting will be held onsge to determine the best accommodation which may result in less than the <br />desired 5' of offset. <br />42:Al OTAVOItl fMet Ir IOCAiG- <br />Ow. .vIll <br />c. Conduit shall be placed six (6) feet deep where crossing existing signal conduit, Traffic Signal conduit shall be potholed and verified on- <br />uCO.ms.u. <br />Sp6ctAill1NlYuit shad be bored unless specified otherwise. <br />2. Contractors shall notify land owner prior to work on all private developments. <br />3. A reminder to the readerthe drawings are scaled, thus dimension is available at all locations. <br />site before hoeing. If unable to maintain six (6) feel of depth where crossing existing signal conchal, a meeting will he held onsite <br />between the city, contractor, and ALLO to determine the best conduit alignment that may be less than 6' deep. <br />4 The contractor shall bypass all MST pedestals with distribution conduit where Installed parallel to MST conduit. Similarly, <br />bypass the T18 "Flowerpot" with MST conduit where installed parallel to future drop conduit. <br />Nt <br />Allo <br />A <br />
The URL can be used to link to this page
Your browser does not support the video tag.