Laserfiche WebLink
1705,a' <br />IPLO., <br />o <br />PON: PON.name <br />DCR: <br />PERMIT: <br />1806 <br />1712 <br />'�,. <br />718 <br />' <br />2505,4"- <br />PLO. <br />A <br />��� <br />I, 131 MST, <br />o(4) <br />10112 <br />li <br />1 <br />� <br />� <br />3 <br />w w <br />U U <br />CEMETERY DR CEMETERY DR <br />C1 <br />1N8. 11)526 T <br />P <br />X24? <br />CEMETERY DR 04' <br />QST 1,i J5 iI5215 O <br />4 <br />W :. <br />1 <br />CU_ <br />y< <br />LEGEND Date.9/19/2022 <br />IIIIIII <br />PON STRUCTURE <br />FIBEREOUIPMENT X small PED <br />MST4 El T48 Vault <br />'2' MST 2 SPLICECLOSURE <br />® RISER A0r0I <br />Aerial <br />POLE - Strand <br />• Unknown <br />UG Bore <br />Feeder Fiber <br />1 1 1 1 Conduit <br />.Riser moved to PL0113 from <br />pole next to PD0058 <br />5007 <br />_ <br />nom <br />ll <br />, <br />41 <br />AM13 <br />r- <br />AM14 <br />i <br />AM15 <br />1 ---- <br />T.,. <br />East of PL0544 on <br />AN13 to SV0019 on <br />this page was moved toJ <br />underground.; <br />,'e , 2 <br />3354 12; NAST. <br />J 52 125 <br />I, 526 <br />AN13 <br />AN14 <br />ANIS <br />N 'N <br />SV0019- current path is crossing traffic <br />signal infrastructure. There has been many <br />x <br />��L <br />595'11;20.1,1126 188'111 2-0 121 1-2 5 RDW <br />new crossings at this intersection in the last <br />0 <br />A013 <br />A014 <br />A015 <br />v.. (115]6 <br />(t)MSTI11 see <br />PD0013 PDppy <br />so n 000 <br />STOLLEN PA R6 <br />v; <br />FD 5768MPIONIN <br />Voo19 <br />few years. Please perform alocale and <br />schedule an onsite meeting with the Streets <br />Division at 308-385-5322 to discuss the <br />most appropriate path at this location. <br />No work shall be performed at this <br />intersection in the month of August due to <br />the Nebraska Stale Fair. <br />w <br />1 <br />2 <br />U <br />3355 <br />L 3333 <br />225 (1120 1211.25 <br />a <br />° CEMETERV DR <br />111 MSI 11)52e <br />Jd11 t <br />f Source: Esri, Maxar. Earthstar Geographies. and the GIS User Corm),nity <br />w <br />�\ <br />O <br />Notes: If there is a stub pole next to a new primary pole, make sure to attach to the primary pole, so the stub pole can be removed once phone <br />has removed their equipment <br />Revisions: 9/9/2022 - extended underground from PL0544 on AN13 to the east to SV0019 <br />I- I BE R u...,.,w <br />9/19/2022 - moved riser to PL0113 from pole next to PD0058 <br />1 In = 112 ft <br />Page 38 of 57 <br />N <br />