Laserfiche WebLink
Page 27 of 57 <br />11 <br />o"" <br />E 554009 <br />i <br />PON: PON.name <br />DCR: <br />PERMIT: <br />NDOT permitted crossing. <br />PLOW ICIRiser <br />-708 <br />down poles l2) 1.15 conduits. set <br />LEGEND Date: 8/8/2022 <br />0041 <br />Pnrnnt p 05252& <br />to <br />•' <br />Vaults as far back in Row as <br />Possible. slack main <br />PON STRUCTURE <br />A <br />side H <br />or the gnwayHighway to be <br />rerouted eventually <br />4035 <br />!8i2, <br />0,288 <br />1.25 B�, <br />` <br />4019 1 <br />PLO 95 <br />4 .-a I <br />Ij <br />, <br />1 PL0494 <br />5.f <br />// 1,188 <br />FIBEREOUIPMENT15 I 746 Vault <br />© <br />MST 6 Aerial Strand <br />c2 <br />MST UG Bore <br />RISER ,,..... _ Feeder Fiber <br />POLE Mil Conduit <br />• Unknown <br />Poles may be relocated or <br />b <br />removed for Highway 30 <br />Relocation <br />._____ <br />/ <br />l! <br />PL050] <br />8d <br />8 <br />r'I <br />, I; <br />t <br />�PLi92 <br />zea <br />3970 <br />so„ <br />311, <br />3P <br />�r <br />J r <br />I 1 r ,2 <br />[yMST <br />3961 <br />REUTING RD W <br />Iti 144 11 [bb <br />3 <br />961 <br />11 i MST. ', 144 tl i <br />_ <br />I.1 <br />4 8 <br />1 IPL0493 <br />TSO 1t <br />� <br />u <br />1611 <br />PL0491 <br />3965 <br />3967 <br />3969 <br />3971 <br />AL9 <br />AL10 I <br />I AL11 <br />AM9 <br />AM10 <br />AM11 <br />1712 <br />5�., <br />153'I .. (1) MST. <br />PLwW� <br />2 100011 <br />1703 <br />150 <br />ce Leri,,,M3xar. <br />(1) 144.11) 288 <br />,288 <br />Earthstar Geographies, and the GIS User Comrn_r • <br />AN9 <br />AN10 <br />I <br />I AN11 <br />Al.to <br />811 <br />Notes: If there is a stub pole next to a new primary pole, make sure to attach to the primary pole, so the stub po e can be removed once phone <br />has removed their equipment <br />Revisions: <br />N <br />1.3F iir' `�* <br />1in=112ft <br />Page 27 of 57 <br />