My WebLink
|
Help
|
About
|
Sign Out
Browse
202207181
LFImages
>
Deeds
>
Deeds By Year
>
2022
>
202207181
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2022 12:05:18 PM
Creation date
10/6/2022 12:03:39 PM
Metadata
Fields
Template:
DEEDS
Inst Number
202207181
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ROW CONSTRUCTION PROJECT NOTES <br />I. The City shall be notified a minimum of forty eight (48) hours in advance of initial project construction. 12. If sidewalk, wheel chair ramps or any portion of the pedestrian facilities are removed or closed, a pedestrian detour shall be established <br />and maintained during the time of the closure and the entire pedestrian facility shall be restored within Seventy-Iwo (72) hours. unless the <br />2. The contractor shall adhere to the current City standard specifications, approved spacial provisions. City standard plans. right l-tray construction contractor provides a hard surface alternate route approved by the city. <br />procedures manual. <br />13. All pedestrian detours and any reconstruction of pedestrian facilities shall meet current Americans with Disability Act (ADA) standards and <br />3 The locations of all aerial and underground utility facilities may not be indicated on the project plans. The contractor is required to contact the One <br />spectficallons. <br />Call s I I notification censer (dial XI I) forty-eight (48) hours prior to working in the city right of way. No excavation will be permitted in the area of <br />the underground utilities until all facilities have been located and identified to the satisfaction of all panics. The contraotoi shall be responsible fur <br />14. All pedestrian detours shall be part of an approved Traffic Control Plan (TCP). <br />protection atoll underground amt aerial utilities and infrastructure. <br />15. All holes made in city pavements for the purpose of performing vacuum excavations to locale underground utilities shall be restored to <br />1. Whenever underground facilities are in close proximity to the proposed pathway location or whenever the vertical location of the underground <br />their original condition with the reinstated core flush with and in the original orientation as the existing surface matching existing pavement <br />facility a unknown. the pet-mince shall use special measures to determine the locations of such underground facilities. <br />surface appearance. <br />a. 111he permittee is conducting the excavation by digging from the surface, when in a close proximity to the underground facilities. the permittee <br />16. When the contractor is not actively working. all equipment, fencing. debris, etc, shag not be placed within the triangular area required for <br />shall use hand digging, hydro excavating, air excavating. or any other techniques that are approved by the City to locate such facility. <br />sight distance of vehicles exiting or entering an adjacent property or intersection. <br />b. If the pm-mince is conducting Me excavation by tunneling or bonng, the permittee shall determine the venin) location of the underground <br />facility by potholing or any other method approved by the City. <br />17. All excavations shall be adequately fenced and covered when contractor 0 not present or project site left unattended. <br />5. Project plans shall dimension new facilities being installed. Measurements shall be taken from existing adjacent visible structures (curbs, poles, <br />18. No lane closures allowed on arterial streets dunng AM and PM peak hours unless approved by City Traffic and Right of Way Construction <br />cabinets, manholes, inlets. fire hydrants clef clearly identifying location of such facility. The contractor shall verify dimensions taken from city tiles. <br />section(s) staff. <br />u. Unless specified on the plan sets, the depth of installed facilities in city row shall Ito ata minimum as tollows. <br />19. All work zone traffic control, including pedestrian control measures. shall be m compliance with 8te MUTCD. ADA, and the City Standard <br />a. Thirty-two (32) inches in soil, if rock present and is an issue Twenty-four (24) inches can be used <br />Specifications. <br />b. Forty-Iwo (42) inches below a projected slope from the flow line of a ditch ata three 13) horizontal and on: f l l vertical slope. <br />20. The City shall be notified a minimum of Seventy Two (72) hours prior to any lane or road closures. <br />21. The contractor shall notify all affected owners of adjacent properties a minimum of forty-eight (48) hours prior to beginning of construction <br />c. Foray-eight (48) inches under a roadway measured from the surface of said roadway to the top of the installation. <br />and provide updates to the affected owners when construction phases change that affect the areas of work associated with the permit. <br />d. Forty-eight (48) inches under a stout water or creek channel design bottom of pipe, and <br />22. The contractor shall maintain a set of "as built" plans on site with dimensioning. These plans shall be presented upon request to any city <br />representative. <br />e. Maintain a minimum of twenty-tour (241 inches of vertical and horizontal spacing from existinn utilities. <br />23. A current city right of way construction permit, a city approved plan set, and traffic control plan shall be maintained on each work site by <br />f. fie heated as t from the existing or proposed curb line as possible to avoid potential future conflicts. <br />the contractor. The contractor shall present such permit and plan set upon request to any city representative. <br />24. The contractor shall remove locale flags after work is complete. <br />7. All potholes in sidewalk panels will be tilled unless directed by City inspector. If colored, textured or patterned concrete is existing. replacement <br />patches, and panels panels will be replaced to match as pre:mable. Owner may be required to put money into escrow to shyer all repairs prior to <br />mining work. <br />25. Any field adjustments to installation of facilities, which vary from the plans that have been submitted and approved during the permit <br />application process, shall comply with the following: <br />b. All pun-street surface materials that are disturbed by excavation and backhllieg operations shall be replaced and restored. <br />a. The contractor must stop work immediately and contract the facility owner. <br />9. City street surface materials disturbed shall be backfilled, tamped and repaved by city (ones or approved paving contractor. <br />b. The facility owner's representative shall contact the city's construction inspector and provide him with the details of the <br />proposed <br />changes. <br />10. All Conduit. vaults and Pedestals shall be located in the public RON' and in public utility easements. <br />c. The City inspector will make a determination on how to proceed. This determination may range from approval over the phone or viae <br />Malan a IS-MbiY <br />/� <br />11. All Aerial shown on attached planet will be permitted separately by Pule Owners. All pole permits submitted to pole owners will follow <br />mail to delaying the project until plans can be updated and appropriate review can be conducted. <br />NESC' codes. <br />26. Crossing City of Grand Island Traffic Signal Infrastructure <br />}('�. <br />_ V _ <br />n below <br />a. Conduit shall not be placed between City's Traffic Signal Cabinet and Connecting traffic signal Conduit and poles. If unable to route the <br />Caisson way <br />conduit around the City's Traffic Signal Cabinet and Connecting traffic signal Conduit and poles because of physical constraints, a <br />meeting will be held onsite with the contractor, city, and ALLO to determine the best conduit alignment between these structures. <br />a <br />tiers yen,b. <br />Conduit shall be offset a minimum of Five (5) feet from the base of any traffic signal cabinet, traffic signal pole, or traffic signal pull box. If <br />Conduit cannot be offset a minimum of Five (5) feet from the base of any traffic signal cabinet, traffic signal pole, or traffic signal pug box <br />because of physical constraints. a meeting wig be held onsite to determine the best accommodation which may result in less than the <br />desired 5 of offset. <br />mimosa nem six,yrevi yams mamma! <br />C. Conduit shall be placed six (6) feel deep where crossing existing signal conduit, Traffic Signal conduit shag be potholed and verified on- <br />"s war .amu. V. <br />SpeclMl1004duit shag be bored unless specified otherwise. <br />2. Contractors shall nobly land owner prior to work on all private developments. <br />3. A reminder to the reader. the drawings are scaled, thus dimension is available at all locations. <br />site before boring. If unable to maintain six (6) feet of depth where crossing existing signal conduit, a meeting will be held onsite <br />between the city, contractor, and ALLO to determine the best conduit alignment that may be less than 6' deep. <br />4 The contractor shag bypass all MST pedestals with distribution conduit where installed parallel to MST conduit. Similarly, <br />bypass the 718 Flowerpot with MST conduit where installed parallel to future drop conduit. <br />Allo <br />(joint <br />A <br />
The URL can be used to link to this page
Your browser does not support the video tag.