Laserfiche WebLink
STAKING SHEET - UNDERGROUND Company: OPTK Networks <br />Exchange:Grand Island <br />CONSTRUCTION PROJECT NOTES <br />1 The State County. City personnel snail to notified a minorum of forty eight 1481 hours in advance of initial project <br />construction <br />2. The utility company and the contractors) are responsible to have at' east one person on the jot at all braes, that .s <br />'sae supervisor certrfed. <br />3. The contractor snail adhere to the current permit and contract specifications <br />4. The locations of all aenal and underground utility facilities may not be indicated on the protect ("tans. The contractor <br />is required to contact the Nebraska and Colorado 811 one call notification center tdial 811 i forty-eight (48) hours <br />prior to working in the 05 njyrt of way. No excavator, will be permitted in the area of the underground utilities until <br />all facilities have been located and identified to the satisfaction of all parties. The contractor snail be responsioie for <br />protection of all underground and aenal ubuities and infrastructure. <br />5. Whenever underground facilities are in close proximity to the proposed pathway locators or whenever the vertical <br />location of the underground facility is unknown. the contractor shall use special measures to determine bre locations <br />of such underground facilities. <br />a d the contractor is conducting the excaxauon by digging from the surface when in a close proximity to the <br />underground facilitesthe contractor scall use hand digging. hydro excavating. or air excavating to locate such <br />facility. <br />b. If the contractor is conducting the excavation by tunneling or bonng. the contractor shall determine the vertical <br />location of the underground facility by potholing or any other method approved by the director of public works and <br />utilities <br />8. Project plans shall dimension new facilities being installed <br />7 Unless agreed to in wntng in advance the depth of insakeo facilities n city and county row seal be at a minimum <br />as follows <br />a Potty -eight 481 inches in sal <br />b. Forty-eight (481 inches below a projected slope hrom the now line of a ditch at a three 13)honzontai and one I1 <br />vertical slope <br />c Forty-eight 1481 inches under a roadway measured from me surface of said roadway to the top of the installation <br />d Sixty (Col inches under a storm water or creek channel design bottom or pipe. and <br />e. Maintain a minimum of twenty-four (241 inches of vertical and horrzonal spacing from existing utilities <br />f Be located as far from the existing or proposed curb Me as possible to avoid potential future conflicts <br />8. At non -sweet surface materials that are disturbed by excavation and backfilling operations shall De replaced and <br />restored <br />6. City and county street surface materials disturbed snail be cackfilted, tamped and repaved by city or county forces <br />or approved paving contractor <br />0. if sidewalk. wheel chair ramps or any portion of the pedestrian facilities are removed or closed. a pedestnan detour <br />shall be esadisned apo maintained during the time of the closure aria the enure pedestrian facility snail De restored <br />within seventy-two 172 i hours. unless the contractor provides a hard surface alternate route approved by the city or <br />county <br />II . AN pedestrian detours and any reconstnicbon of pedestnan facilities snail meet current Americans with Disability <br />Act IADA) standards and specifications. <br />"2. At pedestrian detours shall be parr of an approved Traffic Coned Plan (TCP). <br />"3. AN holes made in the streets for the purpose of performing vacuum excavations to locate underground utilities shall <br />be restored to their original condition wan me reinstated core flush with and in the original orientation as the existing <br />surface matcntng existing pavement surface appearance <br />+4 When the contractor is not actively workingall equipment, fencing, debris, etc. Shall not be placed within tie <br />triangular area required for sight distance of vehdes exiting or entenng an adjacent property or intersection. <br />,. AN excavations shall be adequately fenced and covered when contractor is not present or project site left <br />unattended. <br />lb No lane closures allowed on arterial streets dunng AM and PM peak pours <br />17. An work zone traffic contraincluding pedestrian control measures, shad be in compliance with the MUTCD and <br />ADA <br />18 The oontractor shall maintain a set of "as built plans tic site with drnensionng These plans snail be presented <br />upon request <br />l g. Final "as -built" plans steal be filed with city anWor county within 30 days of the competon of the project. <br />20 The contractor shall follow construction standards pertaining to the lateral corridor facility placement and minimum <br />depth requirements and clearance requirements of other facilities. <br />21 A current State. County. or City permit spall be maintained on each work site by the contractor. Tne contractor <br />shall present such permit upon request. <br />22. Any field adjustments to instakaton of facilities. which vary from the plans that have been submitted and approved <br />during the permit appiicaton process. snail cornply with the following: <br />a The contractor must stop work immediately and contact the facility owner of the proposed changes <br />b. The facility owners representative sham contact the city, county or state right-of-way construction inspector and <br />provide tern wrath the derails <br />c. The ROW inspector will make a determination on how to proceed. This determination may range from approval <br />over the phone or via email to delaying the project until plans can be updated and appropriate review can be <br />conducted. <br />23. Stake mounted wading signs and marker posts 0BM531 to be placed where appropriate <br />24. All conduit and fiber is to he installed at me back of the roadway ROW unless otherwise noted. <br />25. Leave 120' loops ,60' tails at splice points) for mainline fiber in vaults <br />Conduit shall riot be placed between the City s traffic signal cabinet and connecting traffic signal <br />conduit/poles <br />Conduit must be offset a minimum of 5 from the base of any traffic signal cabinet, traffic signal <br />poleor traffic signal pull box <br />Contractor will be required to obtain a permit to work in the ROW (including a traffic control plan) <br />before any physical work is to take place <br />Locate flags shall be removed alter the -excavator' has determined the work is complete <br />IF SIGNAL CONDUIT/WIRE HAS TO BE CROSSED THE NEW LINE SHALL BE A MINIMUM <br />OF 6' DEEP WHERE CROSSING AND THE EXSTING SIGNAL CONDUIT SHALL BE <br />POTHOLED AND VERIFIED ON-SITE PRIOR TO BORING <br />