Laserfiche WebLink
9/7/22, 4:31 PM google_markup_snip_Thu_Sep_1_2022_16-06-34.JPG (1875x985) <br />EXHIBIT "A" 2022/9/1 <br />202206637 <br />place new UG vault here with 100' fiber storage <br />on input and output of new fiber closure <br />follow coax drop to <br />data room right on <br />opposite side of <br />external wall <br />all new fiber will be <br />72ct in 2" duct <br />Tie Point Here Begin at aerial <br />closure match existing aenal <br />storage, place 2 new nsers and <br />begin UG construction <br />30 sq ft of concrete removal and <br />replacement to access tum in bore route <br />ittps://vpc3uploadedfiles.blob.core.windows.net/vpc3-files/grandisland/google_markup_snip Thu_Sep_1_2022_16-06-34.JPG?sp=r&sv=2017-11-098... 1/1 <br />