ROW CONSTRUCTION PROJECT NOTES <br />I. The City shall be notified a minimum of forty eight (48) hours in advance of initial project construction. 12. If sidewalk, wheel chair ramps or any portion of the pedestrian facilities are removed or closed, a pedestrian detour shall be established <br />and maintained during the time of the closure and the entire pedestrian facility shall be restored within seventy-two (72) hours, unless the <br />2. The cwrractor shall adhere to the current City standard specifications, approval special provisions, City standard plans. right -o1 -way constitution contractor provides a hard surface alternate route approved by the city. <br />procedures manual. <br />13. All pedestrian detours and any reconstruction of pedestrian facilities shall meet current Americans with Disability Act (ADA) standards and <br />3. The locations of all aerial and underground utility facilities may not be indicated on the project plans. The contractor is required to contact the One spocifiealions. <br />Call 811 notification censer (dial 811) forty-eight (48) hours prior to working in the city right of way. No excavation will be permitted to the area of <br />the underground utilities until all tircilities have been located and identified to the satisfaction of all parties. The contractor dull be responsible for 14. All pedestrian detours shall be part of an approved Traffic Control Plan (TCP). <br />protection of all underground and aerial utilities and infrastructure. <br />15. All holes made in city pavements for the purpose of performing vacuum excavations to locale underground utilities shall be restored to <br />4. Whenever underground facilities are in close proximity to the proposed pathway location or whenever the vertical location of the underground their original condition with the reinstated core flush with and in the Original orientation as the existing surface matching existing pavement <br />facility is unknown. the nominee shall use special measures to determine the locations of such underground facilities. surface appearance. <br />a. lithe punnittee is conducting the cxcavatiun by digging hum the surface, when in a close proximity to the undergmuml 1ac11ities, rhe permittee 16. When the contractor is not actively working, all equipment. fencing, debris, etc, shah not be placed within the triangular area required for <br />shall use hod digging, hydro excavating, air excavating, or any other techniques that are approved by the City to locate such facility. sight distance of vehicles exiting or entering an adjacent properly or intersection. <br />b. lithe permittee is conducting the excavation by tunneling or boring, the permittee shall determine the vertical location of the underground <br />facility by potholing or any other method approved by the City. 17. All excavations shall be adequately fenced and covered when contractor is not present or project site left unattended <br />5. Project plans shall dimension new facilities being installed. Measurements shall be taken from existing adjacent visible structures (curbs. poles, 18. No lane closures allowed on arterial streets during AM and PM peak hours unless approved by City Traffic and Right of Way Construction <br />cabinets, manholes, inlets. lire hydrants. e1c.) dearly identilymg location of such hcility. The contractor shall verify dimensions taken from city tiles. soction(s) staff. <br />6. Unless specified on the plan sets, the depth of insetted facilities in city row shall be ata minimum as tullaws. 19. All work zone traffic control, including pedestrian control measures, shall be in compliance with the MUTCD, ADA, and the City Standard <br />Specifications. <br />a. Thirty-two (32) tnchs in soil, lima present and is an issue Iwcnly-four (24) inches can be used. <br />20. The City shall be notified a minimum of Seventy Two (72) hours prior to any lane or road closures. <br />b. Funy-Iwo (42) inches below a projected slope from the flow line of a ditch ata three (3) horizontal and one t I) vertical slope. <br />21. The contractor shall notify all affected owners of adjacent properties a minimum of furry -eight (48) hours prior to beginning of construction <br />c. Forty-eight (48) inches under a roadway measured from the surface of said roadway 404501070) the installation. and provide updates to the affected owners when construction phases change that affect the areas of work associated with the permit, <br />d. Forty-eight (48) inches under a storm water or creek channel design button of pipe. and 22. The contractor shall maintain a set of 'as built' plans on site with dimensioning. These plans shall be presented upon request to any city <br />representative. <br />e. Maintain a minimum of twenty -tear (24) inches of vertical and horizontal speedo/ Iron oxirinx utilities. <br />23. A current city right of way construction permit, a city approved plan set, and traffic control plan shall be maintained on each <br />work site by <br />t'. Be located as far from the existing or proposed curb line as possible to avoid potential furore conflicts. the contractor. The contractor shall present such permit and plan set upon request to any city representative. <br />24. The contractor shall remove locate flags aper work is complete. <br />7. All potholes in sidewalk panels will be tilled 11111018 directed by City inspector. If colored. textured or patterned concrete is existing. replacement <br />patches, and panels panels will be replaced to match as practicable. Owner may be required to put money into escrow to cover all repairs prior to 25. Any field adjustments to installation of facilities, which vary from the plans that have been submitted and approved during the permit <br />saving work. application process, shall comply with the following. <br />8. All nun -street surface materials Out are disturbed by excavation and backfilling operations shall be replaced and restored. a. The contractor must slop work immediately and contract the facility owner. <br />9. City street surface materials disturbed shall be baoktilled, <br />tamped and repaved by city Ibrees or approved paving contractor. b. The facdito owner's representative shall contact the city's construction inspector and provide him with the details of the proposed <br />changes. <br />10. All Conduit. vaults and Pedestals shall be located in the public HOW and in public utility easements. <br />c. The City inspector will make a determination on how to proceed. This determination may range from approval over the phone or viae <br />Madam &WW1WI <br />- <br />11. All Aerial shown on attached planet will bo permitted separately by Pule Owners. All pole permits submitted to pule owners will fulluw mad to delaying the project until plans can he updated and appropriate review can be conducted. <br />NE5C codes. <br />26. Crossing City of Grand Island Traffic Signal Infrastructure <br />� '.1 <br />14=1.11•1% <br />a. Conduit shall not be placed between City's Traffic Signal Cabinet and Connecting traffic signal Conduit and poles. If unable to route the <br />Ciihlbame4 <br />conduit around the City's Traffic Signal Cabinet and Connecting traffic signal Conduit and poles because of physical constraints, a <br />meeting will be held onsite with the contractor, city, and ALL() to determine the best conduit alignment between these structures. <br />b. Conduit shall be offset a minimum of Five (5) feel from Inc base of any traffic signal cabinet, traffic signal pole, or traffic signal pull box. If <br />unurs:Qa�tOu;� <br />'.7.4.•:T-,---------- <br />Conduit cannot be offset a minimum of Five (5) feel from the base of any traffic signal cabinet, traffic signal pole, or traffic signal pull box <br />because of physical constraints. a meeting will be held onsite to determine the best accommodation which may result in less than the <br />desired 5' of offset. <br />c. Conduit shall be placed six (6) feet deep where crossing existing signal conduit, Traffic Signal conduit shall be potholed and verified on- <br />'aur" ,9a'"`' <br />,,,,,,,,,,roe. <br />site before boring. If unable to maintain six (6) feet of depth where crossing existing signal conduit, a meeting wit be held ensile <br />between the city, contractor, and ALLO to determine the best conduit alignment that may be less than 6' deep. <br />SPheill(Ih101hArit shad be bored unless specified otherwise. <br />2 Contractors shall notify land owner prior to work on all pnvale developments. <br />3. A reminder to the reader. the drawings are scaled, thus dimension is available at all locations. <br />4. The contractor shall bypass all MST pedestals with distribution conduit where installed parallel to MST conduit. Similarly, <br />bypass the T18 Flowerpot with MST conduit where installed parallel to future drop conduit. <br />LL° <br />N <br />A <br />