My WebLink
|
Help
|
About
|
Sign Out
Browse
202206582
LFImages
>
Deeds
>
Deeds By Year
>
2022
>
202206582
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2022 10:49:01 AM
Creation date
9/12/2022 10:33:39 AM
Metadata
Fields
Template:
DEEDS
Inst Number
202206582
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ROW CONSTRUCTION PROJECT NOTES <br />1. The City shall be notified a minimum of forty eight (48) hours in advance of initial project construction. <br />12. If sidewalk, wheel chair ramps or any portion of the pedestrian facilities are removed or closed, a pedestrian detour shall be established <br />and maintained during the time of the closure and the entire pedestrian facility shall be restored within seventy-two (72) hours, unless the <br />2. The convector shall adhere to the current City rtardard specifications, approved special provisions, City standard pins. right -of -0.Y ...Imola. <br />proocducs manual. <br />contractor provides a hard surface alternate route approved by the city. <br />13. All pedestrian detours and any reconstruction of pedestrian facilities shall meet current Americans with Disability Act (ADA) standards and <br />3. The locations of all aerial and underground utility facilities may not be Indicated on the project plans. The contractor is required to contact the One <br />specifications. <br />Call It l 1 notification center (dial 811) Ibnyeigbt (46) hums prior to working in the city right of way. No excavation will be permitted in the area of <br />the underground utilities until all facilities have been located and identified to the satisfaction of all parties. The convector shall be responsible ler <br />14. All pedestrian detours shall be part of an approved Traffic Control Plan (TCP). <br />protection of all underground and aerial utilities and intieswnure. <br />15. All holes made in city pavements for the purpose of performing vacuum excavations to locate underground utilities shall be restored to <br />1. Whenever underground facilities are in close proximity to the proposal pathway location or wherever the vertical location of the underground <br />their original condition with the reinstated core flush with and in the original orientation as the existing surtace matching existing pavement <br />facility is unknown. the permittee shall use special measures to determine the locations of such underground facilities. <br />surtace appearance. <br />a. lithe pormiuec is conducing the 05841wion by digging riot" Ina surface, ovula:. in a 0164 proximity to the underground technics, the ponnincc <br />16. When the contractor is not actively working, all equipment. fencing. debris, etc. shall not be placed within the triangular area required for <br />shall use hand digging, hydro excavating, air excavating. or any other techniques that are approved by the City to locate such facility. <br />sight distance of vehicles exiling or entering an adjacent property or intersection. <br />b. It the permittee is conducting the excavation by tunneling or boring, the lamina shall determine the venial location of the underground <br />facility by potholing or any other method approved by ilk Coy. <br />17. All excavations shall be adequately fenced and covered when contractor is not present or protect site left unattended. <br />5 Project plans shall dimension new facilities being installed. Measurements shall be taken from existing adjacent visible structures (curbs, poles, <br />18. No lane closures allowed on arterial streets during AM and PM peak hours unless approved by City Traffic and Right of Way Construction <br />cabinets, manholes, inlets, lite hydrants. e¢.) clearly identifying location of such facility. The contractor shall verify dimensions taken faun city files. <br />section(s) staff. <br />6. Unless specified on the plan sets, the depth of installed 1.1001ties in city row shall be ata minimum as follows. <br />19. All work zone traffic control. including pedestrian control measures, Shall be in compliance with the MUTCD, ADA, and the City Standard <br />a. Thirty-two 02) inches in soil, if rock present and is an issue twenty -fou (241 inches can be used. <br />Specifications. <br />20. The City shall be notified a minimum of Seventy Two (72) hours prior to any lane or road closures. <br />b. Furry -two (42) inches below a projected slope from the flow line ol'a ditch at a three (3) horizontal and one t I1 venical slope. <br />21. The contractor shall notify all affected owners of adjacent properties a minimum of forty-eight (48) hours prior to beginning of construction <br />c. Fony-eight (48) inches under a roadway measracd from the surface of sad roadway to the top of the installation. <br />and wade updates to the affected owners when construction phases change that affect the areas of work associated with the permit. <br />d. Pony -eight (48) inches under a storm water or creek chancel design bottom of pipe, and <br />22. The contractor shall maintain a set of 'as boar plans on site with dimensioning. These plans shall be presented upon request to any city <br />representative. <br />e. Maintain a minimum of twenty-four (24) uncle of vertical and horizontal spacing from existing utilities. <br />23. A current city ri hl of way construction permit, a city approved plan set. and traffic control plan shall be maintained on each work site by <br />I Be located as for term the existing or proposed curb line as possible to avoid potential tome conlicts. <br />the contractor. The contractor shall present such permit and plan set upon request to any city representative. <br />24. The contractor shall remove locale flags after work is complete. <br />7. All potholes in sidewalk panels will be filled unless directed by City inspector. 1r colored, textured or patterned concrete is existing. replacement <br />patches, and panels panels will be replaced to mulch as practicable. Owner may be required to put money into escrow to cover all repairs prior to <br />.tuning work. <br />25. Any field adjustments to installation of facilities. which vary from the plans that have been submitted and approved during the permit <br />application process, shall comply with the following: <br />h. All nm -street surface materials that are disturbed by excavation and backfilling operations shall be replaced and restored. <br />a. The contractor must stop work immediately and contract the facility owner. <br />0. City street mac materials disturbed shall be backtified, tamped and .paved by city tones or approved paving contra Tor. <br />b. The facility owner's representative shall contact the city's construction inspector and provide him with the details of the proposed <br />changes. <br />10. All Conduit. vaults and Pedestals shall be located in the public ROW and in public utility easements. <br />11. All Aerial be by Pole Owners. All tallow <br />c. The City inspector will make a determination on how to proceed. This determination may range from approval over the phone or viae <br />madam filNlblfifil <br />shown on attached planet will permitted separately pole permits submitted to pule owners will <br />N1SC' codes. <br />mail to delaying the project unci plans can be updated and appropriate review can be conducted. <br />26. Crossing City of Grand Island Traffic Signal Infrastructure <br />��� <br />immesh •1 <br />immesh <br />a. Conduit shall not be placed between City's Traffic Signal Cabinet and Connecting traffic signal Conduit and poles. If unable to route the <br />GAMIN* pod" <br />conduit around the City's Traffic Signal Cabinet and Connecting traffic signal Conduit and poles because of physical constraints, a <br />ISM .o""'s"""' <br />meeting will be held onsite with the contractor, city, and ALLO to determine the best conduit alignment between these structures. <br />b. Conduit shall be offset a minimum of Five (5) feel from the base of any traffic signal cabinet, traffic signal pole, or traffic signal pull box. If <br />Conduit cannot be offset a minimum of Five (5) feet from the base of any traffic signal cabinet, traffic signal pole, or traffic signal pull box <br />oA` u.. coo aatLawa. <br />`"IX) ,m. cnCM, <br />,u11 atiniaizaziaiwi au awe. <br />because of physical constraints. a meeting w21 be held onsite to determine the best accommodation which may result in less than the <br />desired 5' of offset. <br />- <br />c <br />Conduit shall be placed six (6) feet deep where crossing existing signal conduit, Traffic Signal conduit shay be potholed and verified on- <br />Wan <br />AMY. �..se.eesu.'.�w.... <br />sitebefore boring. If unable to maintain six (6) feet of depth where crossing existing signal conduit, a meeting will he held onsite <br />SpC.ciAilf)l6Aut shall be bored unless specified otherwise. <br />2. ontractors shall notify land owner prior to work on all private developments. <br />3 reminder to the reader. the drawtn s are scaled. thus dimension Is available at all locations. <br />between the city, contractor, and ALLO to determine the best conduit alignment that may be less than 6' deep. <br />4 The contractor shall bypass all MST pedestals with distribution conduit where installed parallel to MST conduit. Similarly, <br />bypass the T18 lowerpol with MST conduit where installed parallel to future drop condua. <br />N <br />N <br />Allo <br />
The URL can be used to link to this page
Your browser does not support the video tag.