Laserfiche WebLink
Pull Box 3 - New UPN Pull Box <br />1 Ea. UPN Pull Box <br />80' of 96 SM (Coil) <br />0 <br />I <br />t <br />Holland Dr <br />1 <br />See Previous Note Sheet 4 <br />2" B <br />J <br />--450'of2"B,96SM,TWI <br />From Pull Box 3 to Pull Box 4 <br />125 of 2" 8, 96 SM , TW <br />From Pull Box 4 to Building Entry Point <br />2 <br />r etyv,r; i <br />IMP r <br />Building Entry Point <br />100' of 96 SM (Coil) <br />Pull Box 4 - New UPN Pull Box <br />1 Ea. UPN Pull Box <br />80' of 96 SM (Coil) <br />J7 1617 Holland Dr <br />:-i <br />PROJECT NO. <br />UPN. P032544 <br />JEO'. 20038.77 <br />DaN.. /3 2022 <br />SHEET NO. <br />Drawn: JDN <br />C heti. MAF <br />Aoolo+eti: LJB <br />Unite <br />ALLO COMMUNICATIONS - <br />COCA-COLA <br />1617 HOLLAND DR. <br />GRAND ISLAND, NE <br />0 25 50 <br />Know wham below. <br />Call before you (lig. <br />PRIOR TO CONSTRUCTION: <br />CALL 811 FOR LOCATION OF <br />UNDERGROUND TELEPHONE, <br />ELECTRIC. GAS (MINS. CABLE <br />TELEVISION AND OTHER UTILITIES. <br />EXISTING UNDERGROUND AND <br />OVERHEAD UTILITIES AND DRAINAGE <br />STRUCTURES HAVE BEEN PLOTTED <br />FROM AVAILABLE INFORMATION AND <br />THEREFORE. THEIR LOCATIONS MUST <br />BE CONSIDERED APPROXIMATE ONLY. <br />ITIS THE RESPONSIBILITY OF THE <br />INDIVIDUAL CONTRACTORS TO <br />EXACTLY LOCATE AND PROTECT EACH <br />EXISTING UTILITY BEFORE AND <br />DURING ACTUAL CONSTRUCTION. <br />DILEO CONSULTING GROUP INC <br />FIBER DESIGN <br />