|
ROW CONSTRUCTION PROJECT NOTES
<br />1 The City shall be non(xd snamnwn01(wfy elle 141 neors in adwaree of ieival pnacawmnmcu00 12 11 samosa. awe' den a dme
<br />ramp arty 110'tpn pedestrian laclilaes ere removed or closed. a pedestrian demur anal be established
<br />son maalaeed Aping their. of She casae pd the entre pedestrian facility shall be restored edam seventy-two (72) Ings. unless de
<br />2. The wmnknor shall adhere lu do current City standhrd specllicahon., apployed spocal p.m.. CR) a 3)ood plant. rghholcwuy.>msnmclion conlrec 0 2°0v4... hod (Leo.011K(We roue approved by the city,
<br />plus docs manful.
<br />7 Inc Iweetspe. of di spur and Wdv. IxdnK+ m. 4 eldcaud'a rlw Ilse cumuewr u I onan rhe r)nr 13 All p030310an detours and any reconstruction of pedestrian facilities shall meet current Americans with Dhsebky Act AGA) Sanderds and
<br />hnl.g.mmd y y ml macs plan' mooed to apecil.ulnns.
<br />('all51) north-aloe reser 14J 8111 forts -nga1401 lows pout le...tlug ea. cry 8,111 el .ay V'. Marta A4) be permuted 10 dr area dl
<br />do sakip..d wincr..544411e Jabcs two Gam 91mr1 rs1.A u10210 Ibo ssa4.ns.n ul all pr10. TO suainsai J..1) 94 responsible fur
<br />14 41 pedeslron detours shall be part Of an approved Traffic Control Plan ITCP)
<br />prownm al dl whkrg,0002 tad ap..11411. and nb4N4.la.
<br />4. W'hcn_•s tar enkt far arc le - d
<br />Imerd pmsimhly In ow proem: pate a) Im.nun or .hone, et do 003wal I.ea0un 01 rhe ord0gmund
<br />15 Al holes made n city pavemenls l0r the purpose of performing vacuum .scavabons to locate ssndergn and utilities shall be restored to
<br />the* ong,ral coeraon w11a the reinstated core gush with and in the a1gnet mentaton as the evd5•m odors matching mating pavement
<br />Mary u unknown f8. pomace .hall use soca) maw. w Gk00100 the ie,snons et such underground labii.
<br />surface appears,.
<br />3 I(1, p.rmv..'.c.d.1v, me..r.. clan Ih 44p91 ew. to .ata.., 01oe m. .50.. Ps...) w d. rabarwnd 1e1tw0., w Wane
<br />16. When the contreclor IS .001 acleety working, 81 equipment h„ng. debris, no. shall no' be placed within Me triangular area requited for
<br />.811 ran fwd Apps, take cs:dvatine. air neat axed 8 pry ole. swhmgwk Ihr ac append by tae City r I.ea, .uA Leary
<br />sight di3a00. 01 vehicb5 ex ong or entering an adpcenl property Or intersection
<br />b 11 do annuals is 043.31 g the clsa won Is, bennehei 38 baring do armee dull wan.. venal bed.m el d.c wbrymwd
<br />racriny •y p shohne or airy who method .poised by da ('115
<br />17 All excavations .nag be adequately fenced and covered when contractor is nor present or project slta NM unattended
<br />5. Preget Oaks shall dimensi08 new facrInes Mins indabed. Meanrememr shall be taken from ex Ming adjaceru noble >uvelures(eurbs. pulp,
<br />18 No lane dosures allowed on enenal streets dvnng AM and PM peek hours unless approved by City Traffic and Right o1 Way Construction
<br />wands. manta., int l5. lire hydra , ek.)1111144y el.00rysne!matron ul sten ra. ilily. Tru cwealvl 553(1 hairy dinlcwham Wren (00511 y tilos
<br />5ectsoo(51 sled
<br />6 Unless specified w do pit fele, the depth 01 Imlalled 111111. an r: Ill row shall be ala minimum 05 tullow.
<br />19. All work zone traffic control melding pedesldan control measures. shag be n complle,e with the MUTCD. ADA, and the City Slanderd
<br />a Thitty4wu132)inch. in soil. /flock pcam1end is anl5snc reenIy-Iiur 124)anises0an be mud
<br />Specilcetdns.
<br />20 Tne City stag he maned a minimum d Seventy Two (72) tours prior b any lane or road closures
<br />b Ferly-lute (42) whoa beton a pro)ixkd steno horn the lox line 01 a dao dr 4 terse (l I bor..' and one Ills enical slope
<br />21 The 000000or shall rollly all affected owners of adjacent propenes a /annum of forty-eght (48) hours poor 50 beginning of construction
<br />0 Fony_oigr 141) mane. under 4 roadway hncasur04 from the safe: of sad roadway to the bailor the installation
<br />and provide updates to me affected ..oars when comtruclion phases change tial affect me areas o) work assooaled 5th the permit
<br />d Forty.c'gr (4e) sm.. under a slonn water or creek channel dutgn bottom of p.p. and
<br />c Ma.. a eine sel tuna-Ow 4141 e.1. al0nnt 31053 Awuwad
<br />22 The contractor shall maintain a set of Ms Ouilr plans on site with dimensioning These dans shall be presented upon request to any city
<br />representative
<br />23 A current sly right of wry construction permit, a dry approval plan set, and base control plan shag be maintained on each work 5de by
<br />W.mab„m',kola, .wase.
<br />f. Be ktcetc401 far firm the means 01 proposed curb linea pm>iblc 1n avoid potential loom confirm m
<br />dee contractor. The connector shell present such perm,l and plan set upon request to any dry represefllalive
<br />24 The malodor shag remove locale lags after work is complete
<br />tel pl5uk-. e.0► A pads will be Atka eek. ddnd ty Op 105pect01 11 colord. tea lured or pmcn,d n0 000l0 re carding rcplaccmen•.
<br />mossok aha pack pant. 1n1) 5c rcpI04d er owls as p0 last Owner may 6c regard IO pal moony Into 004)0310 fewer all Imams pn0r to
<br />040, 0A19
<br />25. Any field adplslmen(s to install*. of angina which vary horn tk dans that nave been submitted and approved dur'rg the perm+
<br />application process. shag comply w01 the following'
<br />a nn n.a.0.el .wase. materials met nm dnuvbsd by essavmton and betpuing opmhnn> shall fie repaeed and mimed
<br />a The contractor must stop work Immediately and contract the tacky owner
<br />9 City moor nate,: Mair AN Jifnribul shall 8c baitillcd, lamp'd and roprred by cry !ono, el appruvul puving.om1a1,r
<br />10 All Conduit ...I,. aid I' deo.l.,15.11 be hwekd in da” public 81110 and an pushc mildly u>.m.nt.
<br />0 The Iafaf seer a f11NS.tenta y4 Opp 8110001act the city 5.051n/odor comes. and 910400 am with the deails Mine proposed
<br />charges
<br />c The Cly nspwclor w,0 make a delerminabon on how 10 This delennsnalron may ramp from over the
<br />11 .11 .\a+w shown un uloid eel will be
<br />da permed sop0Mel) by Po)c lama 111 poll, pants submN.d ro pok ea norms will Io flow
<br />7100ee4. approval phone or viae
<br />nes o delayag Me project untol plans can be updated and 899)09nate review can be conducted.
<br />Mgt
<br />VFX soak
<br />26 Crossing City of Grand Island Traffic Signal Infrastructure
<br />Conga be Mame Trek SqW Comecong
<br />es rode 0.
<br />a shall rel pieced CKs Carnet and gado sans' Combas and poles a rumble
<br />Mng 51n. 0 SigCerdu1 and poles because o1 phyfr81 constraints.
<br />,,Mag 30043 tr. Cas 14/011cgd1 5Cabral and CannW04
<br />0
<br />W ""ms"oa
<br />oaring M a IWd ens. 0n00the eplbecfor era and A(LO io cre :me. the best col.dut salami bewraen these s5u0Nres
<br />b Conant snail orf of.: s marmot' d Five )5) led hon the lase 01 any Nan saner corse) trst,c >qel polo a traffic >gral p.a boa N
<br />Candi) cannot be offset a main. el Five (5) leer from too pose cit .no Valk alma canner wee sigma pole or bad. sand psi hos
<br />...we el Ma.' ceostrnb a redwing M be net rule b octnrnve da oast eceommro.YO1 wh'N may resell n less :Ivor ten
<br />calmed 5 or diet
<br />c Conduit sial be placed sr (dl tae deep .erre c:0sse g existing .qW cond4W, Trak Signal awn. slag be potholed s,d keNlmd on-
<br />n
<br />� .m ma_v ' ..r • ... ,
<br />"' m. _s..-w nom....o-..rw
<br />me
<br />me before 5onrg. 11 unable to wooden La (St teal n1 dopa whe•. crossing maws canal Genun s meet ea wale had ,vase
<br />Sptdadllibleduir steal be bored finless speeded otherwise
<br />2 Contractors shag nobly and owner prior to work on ell prwete devtopmenls
<br />Mager :M 0y, co bbl.Y. and ALLO b darer r30 M beg conget Mpamena toes macs lass Ilan 6 deep
<br />3 A reminder to the reader the drawings are Scaled thus dimen5an is avaaa81 at all locations
<br />4 The contractor shall bypass at' MST pedestals vpth destnbinon conduit were mailed parallel t0 MST conduit Similarly,
<br />bypass the T10 'Flowerpot' with MST conduit where 'installed parallel o future drop OOrdal
<br />Allo
<br />N
<br />
|