Laserfiche WebLink
ROW CONSTRUCTION PROJECT NOTES <br />1 The City shall be non(xd snamnwn01(wfy elle 141 neors in adwaree of ieival pnacawmnmcu00 12 11 samosa. awe' den a dme <br />ramp arty 110'tpn pedestrian laclilaes ere removed or closed. a pedestrian demur anal be established <br />son maalaeed Aping their. of She casae pd the entre pedestrian facility shall be restored edam seventy-two (72) Ings. unless de <br />2. The wmnknor shall adhere lu do current City standhrd specllicahon., apployed spocal p.m.. CR) a 3)ood plant. rghholcwuy.>msnmclion conlrec 0 2°0v4... hod (Leo.011K(We roue approved by the city, <br />plus docs manful. <br />7 Inc Iweetspe. of di spur and Wdv. IxdnK+ m. 4 eldcaud'a rlw Ilse cumuewr u I onan rhe r)nr 13 All p030310an detours and any reconstruction of pedestrian facilities shall meet current Americans with Dhsebky Act AGA) Sanderds and <br />hnl.g.mmd y y ml macs plan' mooed to apecil.ulnns. <br />('all51) north-aloe reser 14J 8111 forts -nga1401 lows pout le...tlug ea. cry 8,111 el .ay V'. Marta A4) be permuted 10 dr area dl <br />do sakip..d wincr..544411e Jabcs two Gam 91mr1 rs1.A u10210 Ibo ssa4.ns.n ul all pr10. TO suainsai J..1) 94 responsible fur <br />14 41 pedeslron detours shall be part Of an approved Traffic Control Plan ITCP) <br />prownm al dl whkrg,0002 tad ap..11411. and nb4N4.la. <br />4. W'hcn_•s tar enkt far arc le - d <br />Imerd pmsimhly In ow proem: pate a) Im.nun or .hone, et do 003wal I.ea0un 01 rhe ord0gmund <br />15 Al holes made n city pavemenls l0r the purpose of performing vacuum .scavabons to locate ssndergn and utilities shall be restored to <br />the* ong,ral coeraon w11a the reinstated core gush with and in the a1gnet mentaton as the evd5•m odors matching mating pavement <br />Mary u unknown f8. pomace .hall use soca) maw. w Gk00100 the ie,snons et such underground labii. <br />surface appears,. <br />3 I(1, p.rmv..'.c.d.1v, me..r.. clan Ih 44p91 ew. to .ata.., 01oe m. .50.. Ps...) w d. rabarwnd 1e1tw0., w Wane <br />16. When the contreclor IS .001 acleety working, 81 equipment h„ng. debris, no. shall no' be placed within Me triangular area requited for <br />.811 ran fwd Apps, take cs:dvatine. air neat axed 8 pry ole. swhmgwk Ihr ac append by tae City r I.ea, .uA Leary <br />sight di3a00. 01 vehicb5 ex ong or entering an adpcenl property Or intersection <br />b 11 do annuals is 043.31 g the clsa won Is, bennehei 38 baring do armee dull wan.. venal bed.m el d.c wbrymwd <br />racriny •y p shohne or airy who method .poised by da ('115 <br />17 All excavations .nag be adequately fenced and covered when contractor is nor present or project slta NM unattended <br />5. Preget Oaks shall dimensi08 new facrInes Mins indabed. Meanrememr shall be taken from ex Ming adjaceru noble >uvelures(eurbs. pulp, <br />18 No lane dosures allowed on enenal streets dvnng AM and PM peek hours unless approved by City Traffic and Right o1 Way Construction <br />wands. manta., int l5. lire hydra , ek.)1111144y el.00rysne!matron ul sten ra. ilily. Tru cwealvl 553(1 hairy dinlcwham Wren (00511 y tilos <br />5ectsoo(51 sled <br />6 Unless specified w do pit fele, the depth 01 Imlalled 111111. an r: Ill row shall be ala minimum 05 tullow. <br />19. All work zone traffic control melding pedesldan control measures. shag be n complle,e with the MUTCD. ADA, and the City Slanderd <br />a Thitty4wu132)inch. in soil. /flock pcam1end is anl5snc reenIy-Iiur 124)anises0an be mud <br />Specilcetdns. <br />20 Tne City stag he maned a minimum d Seventy Two (72) tours prior b any lane or road closures <br />b Ferly-lute (42) whoa beton a pro)ixkd steno horn the lox line 01 a dao dr 4 terse (l I bor..' and one Ills enical slope <br />21 The 000000or shall rollly all affected owners of adjacent propenes a /annum of forty-eght (48) hours poor 50 beginning of construction <br />0 Fony_oigr 141) mane. under 4 roadway hncasur04 from the safe: of sad roadway to the bailor the installation <br />and provide updates to me affected ..oars when comtruclion phases change tial affect me areas o) work assooaled 5th the permit <br />d Forty.c'gr (4e) sm.. under a slonn water or creek channel dutgn bottom of p.p. and <br />c Ma.. a eine sel tuna-Ow 4141 e.1. al0nnt 31053 Awuwad <br />22 The contractor shall maintain a set of Ms Ouilr plans on site with dimensioning These dans shall be presented upon request to any city <br />representative <br />23 A current sly right of wry construction permit, a dry approval plan set, and base control plan shag be maintained on each work 5de by <br />W.mab„m',kola, .wase. <br />f. Be ktcetc401 far firm the means 01 proposed curb linea pm>iblc 1n avoid potential loom confirm m <br />dee contractor. The connector shell present such perm,l and plan set upon request to any dry represefllalive <br />24 The malodor shag remove locale lags after work is complete <br />tel pl5uk-. e.0► A pads will be Atka eek. ddnd ty Op 105pect01 11 colord. tea lured or pmcn,d n0 000l0 re carding rcplaccmen•. <br />mossok aha pack pant. 1n1) 5c rcpI04d er owls as p0 last Owner may 6c regard IO pal moony Into 004)0310 fewer all Imams pn0r to <br />040, 0A19 <br />25. Any field adplslmen(s to install*. of angina which vary horn tk dans that nave been submitted and approved dur'rg the perm+ <br />application process. shag comply w01 the following' <br />a nn n.a.0.el .wase. materials met nm dnuvbsd by essavmton and betpuing opmhnn> shall fie repaeed and mimed <br />a The contractor must stop work Immediately and contract the tacky owner <br />9 City moor nate,: Mair AN Jifnribul shall 8c baitillcd, lamp'd and roprred by cry !ono, el appruvul puving.om1a1,r <br />10 All Conduit ...I,. aid I' deo.l.,15.11 be hwekd in da” public 81110 and an pushc mildly u>.m.nt. <br />0 The Iafaf seer a f11NS.tenta y4 Opp 8110001act the city 5.051n/odor comes. and 910400 am with the deails Mine proposed <br />charges <br />c The Cly nspwclor w,0 make a delerminabon on how 10 This delennsnalron may ramp from over the <br />11 .11 .\a+w shown un uloid eel will be <br />da permed sop0Mel) by Po)c lama 111 poll, pants submN.d ro pok ea norms will Io flow <br />7100ee4. approval phone or viae <br />nes o delayag Me project untol plans can be updated and 899)09nate review can be conducted. <br />Mgt <br />VFX soak <br />26 Crossing City of Grand Island Traffic Signal Infrastructure <br />Conga be Mame Trek SqW Comecong <br />es rode 0. <br />a shall rel pieced CKs Carnet and gado sans' Combas and poles a rumble <br />Mng 51n. 0 SigCerdu1 and poles because o1 phyfr81 constraints. <br />,,Mag 30043 tr. Cas 14/011cgd1 5Cabral and CannW04 <br />0 <br />W ""ms"oa <br />oaring M a IWd ens. 0n00the eplbecfor era and A(LO io cre :me. the best col.dut salami bewraen these s5u0Nres <br />b Conant snail orf of.: s marmot' d Five )5) led hon the lase 01 any Nan saner corse) trst,c >qel polo a traffic >gral p.a boa N <br />Candi) cannot be offset a main. el Five (5) leer from too pose cit .no Valk alma canner wee sigma pole or bad. sand psi hos <br />...we el Ma.' ceostrnb a redwing M be net rule b octnrnve da oast eceommro.YO1 wh'N may resell n less :Ivor ten <br />calmed 5 or diet <br />c Conduit sial be placed sr (dl tae deep .erre c:0sse g existing .qW cond4W, Trak Signal awn. slag be potholed s,d keNlmd on- <br />n <br />� .m ma_v ' ..r • ... , <br />"' m. _s..-w nom....o-..rw <br />me <br />me before 5onrg. 11 unable to wooden La (St teal n1 dopa whe•. crossing maws canal Genun s meet ea wale had ,vase <br />Sptdadllibleduir steal be bored finless speeded otherwise <br />2 Contractors shag nobly and owner prior to work on ell prwete devtopmenls <br />Mager :M 0y, co bbl.Y. and ALLO b darer r30 M beg conget Mpamena toes macs lass Ilan 6 deep <br />3 A reminder to the reader the drawings are Scaled thus dimen5an is avaaa81 at all locations <br />4 The contractor shall bypass at' MST pedestals vpth destnbinon conduit were mailed parallel t0 MST conduit Similarly, <br />bypass the T10 'Flowerpot' with MST conduit where 'installed parallel o future drop OOrdal <br />Allo <br />N <br />