My WebLink
|
Help
|
About
|
Sign Out
Browse
202204342
LFImages
>
Deeds
>
Deeds By Year
>
2022
>
202204342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2022 11:03:56 AM
Creation date
6/14/2022 11:02:28 AM
Metadata
Fields
Template:
DEEDS
Inst Number
202204342
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.• • - •...'ietM -ts •wet,: . stiti<Qns.M <br />CenturyLink- <br />CenturyLink. Fiber Services <br />Pre -Installation Site Readiness <br />Equipment Environment <br />IX <br />The CenturyLink equipment requires a clean, well lit, dust and vibration free environment that is controlled to temperatures of 55 to 85 degrees Fahrenheit and <br />humidity of 70% or less. <br />Entrance Facilities <br />S1t!m'rg(L_g'utred <br />Conduit is a plastic pipe which will run from the edge of your business property line to the negotiated (between building owner and CenturyLink) equipment <br />location inside your building ("demarcation point"). <br />*CenturyLink may assist in providing entrance facilities on qualified opportunities on a per -site basis within the guidelines. Check with your sales representative <br />to identify options that may benefit your business. <br />Note: If your business is located in a building that is not owned by your company. then CenturyLink will need the name and contact information for your <br />building owner/manager to attain the necessary agreement to meet this requirement. <br />Clear Pate <br />1 X <br />Customer Action Required <br />CenturyLink will provide <br />A clear path, as shown in the below visual diagram, from the building's Main Point of Entry (MPOE) to your suite/floor's Telco Room is required. A clear path is <br />typically established with conduit, to include pull tape, which allows for the cable extensions (Cat5e or above/fiber) within the building. <br />We may or may not be able to use the existing conduit for various reasons such as full capacity or private ownership. Please address this with your building <br />manager to ensure a clear path is available. CenturyLink may assist in providing clear path on qualified opportunities on a per -site basis within the guidelines. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.