Laserfiche WebLink
STAKING SHEET - UNDERGROUND Company: OPTK Networks <br />Exchange: Grand Island <br />CONSTRUCTION PROJECT NOTES <br />' The State. County. City personnel shall be notified a minimum of forty eight (48) hours in advance of initial project <br />constructor. <br />The unary company and the contracbrts) are responsible 10 have at least one person on the lob at all times. that rs <br />'sae supervisor' certified. <br />3 The contractor shall adhere to the current perms and contract specifications <br />4 The locations of all aerial and underground 0Nry faal ties may not be indicated on the project plans The contractor <br />s required to contact fete Nebraska and Colorado 811 one call rhoafim can center (dial 8 (1)1cityeight (481 hours <br />pear to working 1n the maty night of way No excava8on will be pecrateed in Me area of the underground attires until <br />alt fatal bes have been located and iderntfied to the salmi action of all partes The contractor Shall be responsible for <br />protOotIon of ail underground and aerial tattles and infrastructure <br />5 Whenever underground fealties are In close proximity to the proposed pathway Ioration or whenever the vertical <br />locator of the underground facility Is unknown. the contractor shall use specW measures to determine the locations <br />of such underground escapes <br />a If the contractor 1s conducting the excavation by dogging from the surface. when in a dose povmity to the <br />underground facilitiesthe contractor shall use hand digging. hydro excavating or all excavabng to locate such <br />facility <br />b If the contractor is conducting the excavation by tunneling or boring, are contractor shall determine the vertical <br />Location of the underground taaHy by potholing or any other method approved by the director of public works and <br />Latices <br />9. Project plans shall dimension new facilites being installed <br />7 Unless agreed to in wring on advance the depth of installed facilities in city and county row shall be ata minimum <br />as triows <br />a 10 ly- t ht (481 inches n sal <br />Is Forty-eight (481 inches below a projected slope from the flow line of a [Inch a1 a three 131 honzartal and one (11 <br />404110. SLOP. <br />c Forty-eight (48) inches under a roadway measured from the surface of said roadway to the tap of the .15Wl,abon <br />d Sony 1801 inches under a storm water or creek dnannel design bottom or pipe and <br />Manaen a minimum of twenty-four (24) races of vertical and hormonal spacing from existutg 1101ttt05 <br />f Be Irratea as far from the earsting or proposed curb line as possible to avoid potential future ctxcelots. <br />8 All non -street surface materials that are disturbed by excavation and backfiing operations shad be replaced and <br />restored <br />9. City and county street such materials disturbed shad be backfilled, tamped and repaved by city or county forces <br />or approved paving contractor <br />10. t sidewalk wheel clam ramps or any portion of the pedestrian factaes are removed or dosed. a pedestrian detour <br />Shall be established and maintained during the [erne at the closure and the entre pedestrian fealty shall be restored <br />*Rhin seventy -bio 172i hours. utuess Ne Contractor anovldez a hand surface alternate route approved try the pii a <br />acerb <br />All pedestrian detour and any reconstructor or pedesman facilities snarl meet current Anericam With Dhsah.liry <br />Act (ADA) standar*, and speoficadons <br />All pedestrian detours shall 0e pat of an apprmed Traffic Contra Plan (TCP 1 <br />AN fides made on the sneer* for the purpose of performing vacuum excavations to locate underground Whores shall <br />0e restored to their tang nal condition rah the reinstated core flush with and In the onglnal arientabon as the en5atg <br />surface matching existing pavement surface appearance <br />14. Wren the contractor Is not actively working_ at eWnprne t fphclrg, debris. Mc. Shall not be Placed w1thun use <br />eiangufan area required kx sight distance of vehicles exiting or entering an adjacent property Of intersection <br />15 All e.133a30,13 shag be adequately fenced and covered when contractor is not present or project Sue left <br />unattended. <br />18. No lane closures allowed on arleru1 streets durng AM and Ph1 peak hours <br />17 All work Done traffic control. noturang pedestrian aorta measures. shall be in compliance with the MUTCD and <br />ADA. <br />18 The contractor shall mantas a set of 'as bullr plans on site with dvnenscnng. These plans 51,214 ore presented <br />upon request <br />10 Final 'as -burr pans shall be filed Wath city tractor county withal 30 days of the completion of the protect. <br />20 The contractor shael follow construction standards pertaining to the lateral corridor facility placement and minimum <br />depth ,01181-e1110015204 clearance requirements of other facilites. <br />21 A current State. Ceurrty. a City permit shall be maintained on each work site by the contractor The contractor <br />shall present such permit upon request <br />22 Any field adjustments to mslaaabon of faabbes. *firth vary from to plans that have been submitted and approved <br />during the permit applicator 81oa55. shall carnal/ with the following'. <br />Tho 0ntract0r 10051510p work trarlediately and contact the featly owner of the proposed changes <br />b. The facilely owners represehtatrve shall contact the cty, county or state fghfoflvay construction inspector and <br />provide hem with the details. <br />c The ROW inspector will make a detennnaeon on how to proceed. Thhs determination may range horn approval <br />over the phone or 0a erred to delaying the project until plans can be updated and approphate review can be <br />conducted <br />23. Stake mounted waning signs and marker posts (BM53) to be placed where appropriate <br />24. All conduit and fiber n 5 be installed at the hack of the roadway ROW unless otherwise noted <br />25. Leave 120' bops (90' tarts at splice 8oim51 for manure filar in vaults <br />Conduit shall not be placed between the City s traffic signal cabinet and coenecb g traffic signal <br />corduNpoies <br />Condur must be offset a minimum of 5 from the base of any traffic signal cabinet. traffic signal <br />pole or traffic signal pull box <br />Contractor will be required to obtain a pemut to worts in the ROW (Including a traffic control plan) <br />before any physical work Is to take place <br />Locate flags shall be removed after the 'excavator" has determined the work Is complete <br />IF SIGNAL CONDURIWIRE HAS TO BE CROSSED THE NEW LINE SNAIL BE A MINIMUM <br />OF 6DEEP WHERE CROSSING AND THE EXSTING SIGNAL CONDUIT SHALL BE <br />POTHOLED ANO VERIFIED ON SITE PRIOR TO BORING <br />