Laserfiche WebLink
202203417 <br />right to protest the creation of any future water district within or abutting the subdivision. <br />3. Sanitary Sewer. Public sanitary sewer main is not available to the <br />subdivision; therefore individual systems shall be permissible on an initial basis. However, the <br />Subdivider waives the right to protest the creation of a sanitary sewer district within or abutting the <br />subdivision. <br />4. Storm Drainage. The Subdivider agrees to provide and maintain positive <br />drainage from all lots, according to the drainage plan, so that storm drainage is conveyed to a public <br />right-of-way or to other drainage systems so approved by the Director of Public Works. If the <br />Subdivider fails to grade and maintain such drainage the City may create a drainage district to <br />perform such work. The Subdivider agrees to waive the right to object to the creation of any drainage <br />district benefitting the subdivision <br />5. Sidewalks. Immediate sidewalk construction adjacent to North Road shall be <br />waived. However, the sidewalks shall be constructed when the property owner is directed to do so by <br />the City Council. In the event a Street Improvement District is created to pave any public street in the <br />subdivision, the Subdivider agrees to install public sidewalks within one year of the completion of <br />such street improvement district in accordance with the City of Grand Island Sidewalk Policy. <br />The Subdivider shall maintain all public sidewalks required by the City of Grand Island. <br />6. Easements. Any easements shall be kept free of obstructions and the <br />Subdivider shall indemnify the City for any removal or repair costs caused by any obstructions. In <br />addition, the duty to maintain the surface of any easements to keep them clear of any worthless <br />vegetation or nuisance shall run with the land. <br />3 <br />