Laserfiche WebLink
1/31/22, 9:22 AM <br />N <br />B <br />—I <br />RWIP-22-2 2429 COLLEGE ST <br />This Space Reserved for Register of Deed <br />Please retum to: <br />Catrina DeLosh <br />Public Works Department <br />PO Box 1968 <br />Grand Island, NE 68802 <br />n= <br />N <br />• <br />Right -of -Way Infrastructure Permit <br />This Right -of -Way Infrastructure Permit is granted by the CITY OF GRAND ISLAND, NEBRASKA, a municipal <br />Corporation, herein referred to as the "Permitor" and Celico Partnership dba Verizon Wireless & , Owner, <br />hereinafter referred to as the "Permittee". <br />1. STATEMENT OF PURPOSE. The purpose of this Permit is to set forth the terms and conditions, under which <br />the Permittee may construct, maintain, repair, and utilize the following described improvement which will infringe <br />upon a public right of way: <br />To access the City's public right-of-way for installation of Verizon Wireless poles and fiber conduit cable in the <br />public right-of-way at the intersection of College Street and Custer Avenue, per the attached Exhibit "A" dated <br />2022/1/20 and consisting of thirteen (13) pages. <br />2. DESCRIPTION OF PERMITEE'S INFRASTRUCTURE LOCATION. The Permittee owns the infrastructure <br />within the Permitor's public right of way to which this Right -of -Way Infrastructure Permit shall apply: <br />LOT ONE (1), GIPS SOUTH SUBDIVISION, CITY OF GRAND ISLAND, HALL COUNTY, NEBRASKA. <br />3. PERMITEE'S DUTIES AND RISKS. It is understood and agreed that the Permittee may construct, maintain, <br />repair and utilize the above described improvement at the Permittee's sole risk. The Permittee hereby waives any <br />claim for damages against the Permitor, its officers, employee, agents and independent contractors for any <br />damage or injury that may result to said improvement. If the Permitor, in its sole discretion, determines that any <br />part or all of the improvement must be removed or is damaged by the Permitor, its employees, agents or <br />independent contractors working for the Permitor during the course of their employment or duties with the Permitor, <br />the Permittee agrees to assume and pay all costs relating to the replacement or repair of the improvement. <br />Permittee indemnifies and holds the City harmless from and against all claims arising out of the use or occupancy <br />allowed under this permit. <br />Licensee is responsible for their contractor obtaining a Right -of -Way permit from the City of Grand <br />Island Public Works Department, as well as submitting an approved traffic control plan prior to <br />commencement of any work. Locate flags shall be removed after the "excavator" has determined the <br />work /s complete. <br />Licensee shall coordinate any and all work with the City of Grand Island, their consultant, and <br />contractor to eliminate any interference with know/marked City utilities. Any interference with City <br />utilities shall be addressed immediately and at the expense of the Licensee <br />4. PROTECTION OF EXISTING UTILITIES. The Permittee is responsible for locating and coordinating original <br />construction and future maintenance work on the described improvement. No excavation work will be permitted in <br />the area of underground utility facilities until all such facilities have been located and identified to the satisfaction of <br />all parties. The excavation must be done with care in order to avoid any possibility of damage to the utility facility. <br />The Permittee shall be responsible for any and all damages, Maintain minimum of three (3) feet from underground <br />electric lines where fiber cable will parallel. <br />5. RESTORATION OF PROPERTY. If the construction or maintenance of the improvement identified in Paragraph <br />1 above requires the excavation of earth, removal of hard surfacing, grass, vegetation, landscaping, or any other <br />disruption of the surface of the public right-of-way or neighboring property, the Permittee shall restore the surface <br />of the area to the same condition as it existed immediately prior to the Permittee's work in the area. <br />6. EFFECTIVE DATE. This Right -of -Way Infrastructure Permit shall take effect on the date it is executed by the <br />Public Works Director/City Engineer of the City of Gpetnd Island as dated below. It shall continue for an indefinite <br />nrqn <br />rn <br />t/1 <br />a <br />tArlN <br />N <br />cD <br />1' <br />1 <br />gq Ck3 <br />1/2 <br />