Laserfiche WebLink
202200027 <br />2. The customer shall provide, install and maintain the following per applicable codes and <br />regulations: <br />a. A reinforced concrete transformer pad with primary conduits stubbed out per <br />GIUD provided Specification. <br />b. Schedule 40 PVC secondary conduits from the customer's transformer pad to <br />the customers current transformer cabinet/main switch/meter socket. <br />c. Current transformer cabinet and/or meter socket. <br />d. Vehicular barriers, per GIUD provided specification. <br />e. Utility easement shall be provided at no charge to GIUD if an extension of GIUD <br />facilities outside of an existing easement or ROW is needed. Customer <br />equipment shall not be installed in a GIUD easement unless easement <br />encroachment is granted by GIUD. <br />f. Final site plan with exact installation location for the charging stations must be <br />approved by GIUD before construction begins. <br />The Grand Island Utilities representative for this project is Travis Burdett. Travis can be <br />contacted at 308-385-5466 and email travis.burdett(giud.com <br />Should you have any questions, please contact me. <br />Sincerely, <br />24A41(itt— <br />Travis W. Burdett <br />Assistant Utilities Director <br />City of Grand Island, NE • Utilities Department • Transmission Division <br />PO Box 1968 • 700 E Bischeld St • Grand Island, NE 68802-1988 <br />www.giud.com <br />