Laserfiche WebLink
ROW CONSTRUCTION <br />I Tit,: City shall be notified . n cin.... of coy eight pith hours in .daaroe of initial prokcl sanest/0m <br />2 The vonua:or .a:l adhere to the torrent CoyuisAnd specifications, coil I ('it standard Ice-wa ceakuclon <br />s spec approved mewl pmvswro y plans. ngk Y <br />procedures manual <br />3 The locations of all anal and wham ground utility rondoaa may not be unheated un the propel plane The contractor IS required to contact the One <br />Cull Ill notiflcOton center (dial h I I 1 tarty-night 4431 haus poor to working in the city right of way No excavation will be permitted in the arm of <br />PROJECT NOTES <br />12 If sidewalk wheel chair ramps or any portion of the pedesthen facilities are removed or dosed. a pedesbnan delay alel be <br />during the she the the laeitity' be <br />established <br />unlit. the <br />standards and <br />end nlaMakled of closure and enema pedestal shall restored within aw•ny-two (72) hour, <br />Wnyaetor prove.g a fwd sudaea ahem., routs approved by tha cOy <br />13 AN pedesWn dolours and any reconstruction of padaslnan facilities shall meet current Americans with Disability Act (ADA) <br />epecilcel'ehe <br />the umkrgoouvl uthtica wed all facilities hat c boon hosted and idealii.ed w she satisfaction ul all mulles T c vont. i shall be ieponatble An <br />11 NI pedestrian debun .hal be pert of en approved Treble Coned Plan ITCP) <br />protection of all underground and anal utilities and infrastructure <br />15 99 holes made In city pavements for the purpose of performing veru rn aaeavatlona to locate underground Wellies shall be teetotal to <br />4 w hent a adoxgmund )*Hire, re in clam prnxmtny 10 fly proposed pane ay inseam tar *Menet 44 du v.mk.l lunation utile undergo°and <br />Ptak otptnal co sedan wen the reinstated con lush with and In 6e ottani orentetlon es the existing surface matching existing pavement <br />raeilny i. unknown the pemainee trail me special mevfurs :u determkw the locations of such underymaed f 'il,te. <br />addle.* appennee <br />. ii to rymmuke n ca dovtinl the ext samon by dggnng hum oho wrf t, when w a Odic pnatmtly *Mc undorymad (rdiat,n. the permluec <br />15 When IM contractor is not actively working, W equipment. fencing. debris. slue snag not be placed wean IM triangular area required 'or <br />shall use hand togging, hydro cxcavuting, an excavating. or any other Iechnpues Ng ams approved by the City to knot: such Wilily <br />sight dietetics of valetas exilingor entering an aljecent property or intersection <br />b It the pcmmnln is conducting the scut won by tunneling or bunny. the permuYc shall dklcminm the venhal location of nit untegrwal <br />Iacdity by Potholing or any other method approved by the City <br />17 NI excavations shall be adequately fenced and covered when contractor is rept present or proses site Ml unhadended <br />5 ironed plum shall dimension new facilities tieing installed utaaevents shall be taken from existing djaemu .ithle structures (curbs. poles, <br />16 No lane Bosuns allowed on arterial strata dunng AM and PM peak hams unless approved by City Traffic aro Right of Way Conslooc00n <br />unmet., nunhodon, midi. two hydrants ole) olcally uknbfying location id such facility Tin. contractor Mall salty dimensions taken from city M. <br />section(.) W9 <br />6 links, saw lid oto the plan sots. the depth of tnnOned so,iims in city taw duh he at . minimum a inflows <br />16 M work zone trek control. including pedssoten coned measures. shall be M corndiro. with the MUTCG. ADA, aro the City Standard <br />• Thorny-Iwo (32) whet in soil, d ruck present ul o an .an,,e twang-I'an (24) (echo. can pe used <br />Sp*n6Gtlons <br />b Fony.iwo 14?)tnoho. Pelee a pro(ecied slope from the Dau In cal a ditch at a thew (3) buwelat.14me l l) venial slope <br />20 The City .hall be nold d a minimum of Seventy Two (72) hours prior to any lane or road closures <br />21 The contractor shell nosy el attested owners of adjacent properties • minimum of bdy-eight (49) loon pronto beginning Of conOtrudion <br />e Forty-eight lox) ,nvhc.:unser a neodwry imagined hon the surface of sad roadway to the by of the installation <br />and provide updates b On, erected owners when 000alnetgn phases change that yodel the areas of work associated wen that permit <br />d Funy-night tall mehm under a .stone water or creek <br />c MaataeS mrsmwn ofnumy-mw LOyaxtooc <br />channel design hatom of pipe, and <br />.orwal sal hweaW resew rm. essnies wwsa <br />22 The contractor shag malnatn • eel of'as bill' pans on eke with dimensioning These plans shat be presented upon request to any ON <br />repnsenlatwe <br />23 A current dip right of way construction perm*. a city approved plan set. and traffic control plan sled be maintained on each work see by <br />r. Oo kwa.•d a, fa lion the :resting or proposed cab hen as possible la .vsed poynfiai fume confine <br />W centre.), The contractor shall powers such permit and pan set upon request to any city r•prawnMllve <br />24 Th* contractor shell remove locate lags alter work Is complete <br />7 All potholes in.dou,lk panels cill b: lillad union O,.00ted by City imp:clot Ifvolunud textured or patterned commie ie existing replacement <br />padre., and panels panda will be repiaoed o'nmch as psolteablo Owner may be required to put money into escrow lo cover Al nepun primo <br />.laming work <br />25 Any field adjustments to installation of facilities, witch vary ham the plana that have been submitted and approved during the permit <br />apdk eon process. gull comply with the blowolg. <br />s All non-street surface normals that Ye disurbed by excavation and backf fling operations shell he replaced and restored <br />a The contractor net slop work immediately and contrail the Moldy owner <br />9 Ciy erect aorta, mat. mats do-withal shall be hakiilled, tamped and spas.: by only woos a appy tad ryvtng wntracns <br />to All ( undo s. v.au and Y.W..lah shall he hseand in the public ROW and in public unlit' ea...mins <br />b The War owheW1 ledrewx(al4e shall contact the etlys construction inspector and provide hen with the deals d 6e proposed <br />changes <br />C The Cly Inspector will rake • determination on how to proceed This deannkulton may range from *pprov. over the phone or viae <br />enrr galAlaala <br />I I All Aural shown on atlahal panel will b: ponninod separately by Polo (loners Alt pole permits s submitted pole owners will billow <br />NPSC sm., <br />nal to delaying the project until paha ns can be updated aappropriate reviewcan be conducted <br />26 Crossing City d Grand Island Italic Signal Infrastructure <br />IIIIIIIIIIMI <br />• Conduit stall not be paced between ay' Tralltc Spin Cabinet and Connecting traffic signal Conduit and poles If unable to route the <br />conduit around the City's Talc Signal Cabinet and Connecting traffic signal Conduit and poles because of physeal constrain, a <br />"a "- <br />mating will be held Orate with the contractor, city. and ALLO to determine the best conduit alignment between stew structures <br />s <br />b Conduit shall be abet a minimum 01 Flee (5) fed Iron, the base of she traffic signal cabinet. trate signal pole. or traffic signal pull box II <br />m sr <br />Conduit cannot be 06tt1 • minimum .4 Fye (5) Net Iron the base of any traffic signal cabinet, baffle signet pole, 01 traffic signal pull box <br />Moms of physical conetretna, a meeting wR be held on.4. to determine the best *ccornnodaibn when tory result in ass len the <br />desired S' of allele. <br />4MS10.11.04.1 ,1311•14.11.4.111011. <br />mm ....4444..,sur <br />C Gondol shell be placed .ix (6) Mhe <br />at deep wham crossing emend signet conduit. Traffic Signal conduit sheand n <br />1 be potholed averified o <br />bean boring It unable to rnenan six (6) feel of depth where among exsnng signal conduit. a meeting will he halo onsite <br />between the city, contractor, and ALIO b determine the best conduit alignment that may be lass than 6' deep <br />4-11,4“.17441,1,_- <br />SgcWylalaakl treat be cored unless specified otherwise <br />2 Contractors shall notify wit owner prior to wore on all pnvele developments <br />3 A reminder to the reader IM drawings are scaled. thus dimension a available a1 w butane <br />4 The contractor shall bypass al MST pedestals with dslnbuton condgl when installed pastel to MST conduit Similarly, <br />byoas. the Tie "Flowerpot' with MST conduit where installed parallel b future drop conduit <br />Allo <br />A <br />