My WebLink
|
Help
|
About
|
Sign Out
Browse
202109365
LFImages
>
Deeds
>
Deeds By Year
>
2021
>
202109365
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2021 3:52:40 PM
Creation date
11/4/2021 3:50:27 PM
Metadata
Fields
Template:
DEEDS
Inst Number
202109365
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STAKING SHEET - UNDERGROUND Company: OPTK Networks <br />Exchange:Grand Island <br />Conduit shall not be placed between the Cry's traffic signal cabinet and connecting traffic signal <br />conduit/poles <br />Conduct must be offset a minimum of 5 from the base of any traffic signal cabinet traffic signal <br />pole, or traffic signal puU box <br />Contractor will be required to obtain a permit to work in the ROW (including a traffic control plan) <br />before any physicalwork is to take place <br />Locate flags stall be removed after the 'excavator has determined the work is complete <br />IF SIGNAL CONDUITNVIRE HAS TO BE CROSSED THE NEW LINE SHALL BE A MINIMUM <br />OF 6 DEEP WHERE CROSSING ANO THE EXSTING SIGNAL CONDUIT SHALL BE <br />POTHOLED ANO VERIFIED ON-SITE PRIOR TO BORING <br />tOcation of the underground taoley .s lxheenown. the contractor snail use spell measures to determine the Iw coons <br />of suds underground feoedes. <br />a 1 the contractor Is conducting the excavation by digging from the surface_ when in a close proximity b the <br />underground f tcdrbes. the contractor Shall use hand digging. hydro excavating. or err excavabflg to locate suds <br />fatality <br />b If the cantracfor Is conducting the excavation by nunnelirg or bonng, tme co,Vaaor shall determine the vertical <br />location of the underground faintest, by potholing or any other method approved by the director df public worts and <br />401405 <br />b Project plans shall drmenson new feolines being installed <br />7 Unless agreed o In writing n advarhoe the depth of instated facilites es city and county row shall be ata minimum <br />as follow <br />a Forty-eight 148) inches n 501 <br />b Forty-eight 148, inches below a protected sage from the flow the of a ditch ata twee (31 Mrrsornal and one ( 1 ) <br />veatical 510pe. <br />c cony -eight 148) Inches under a roadway measured from me surface of said roadway to the to of the amallalim <br />d Sony 1110) inches unser a storm water or creek channel design bottom or pipe, and <br />Maintain a minimum of twenty-four (24) cotes of vertical and horvmbt spacing from existing uti14es. <br />f Be located as far from the existing or proposed curb hoe as possible to avoid potential future conflicts <br />B A.Y non -street surface matenafs that are disturbed oy exeavabon and batltfling operations shale be replaced and <br />restored <br />8 City and cowry street surface oaten els disturbed shall be backfilledt tamper, and repaired by dry or county forces <br />Or approved paving oonba Liar <br />10 If sidewalk, wheel chair ramps or any oomon of the pedestna1 facades are removed or dosed, a pedestrian detour <br />shalt be estodished and manraued during the time pr' 1110 closure and the enure pedestrian faddy shall be restored <br />within seventy -tyro 172) nous unless the contractor provides a ham surface alternate route approved by the city or <br />unty <br />11 AI pedesblan detours and any reconstruction of pedesuun faaWes shalt meet dere t An.MUns with Desabley <br />Act I ADA) standards and spedfica*ons. <br />12 AN pedestrian detours shad be pan of an approved Traffic Control Plan ITCP,. <br />13 AI holes made n the streets for Me purpose of perforling va0Win excavations to locate underground alines 5)54 l <br />be restored to their anginal c0drbon sun me reinstated core flush with and in the original onentabon as the existing <br />surface matddrg existing pavement surface appearance <br />14 When the 0001, ctor Is no actively Marking. ad a ulpnerrl, fencing. debts. etc Shat nOt be placed within the <br />tnanqulsr area required for sight distance of vehicles exiting or entering an adjacent property or ntexsecLmn. <br />15. At excavations shalt he adequately fen old and •bvered when contractor is not present or protect site Left <br />undecided <br />1 PROJECT NOTES <br />10. No lane closures allowed on arsenal streets Moog AM and PM peak hours. <br />17. AN work zone traffic c0n001, elcludi g pedestrian control measures, snail be In compliance with the MUTCD and <br />ABA <br />8 The corm -actor shall maintain a set of "as boat plans on see wen dimensioning These plans shad be presented <br />upon request <br />t r. Final 'as-budf plans shall be filed wen city arta'or county whin 30 days of the completion of the profe8tt <br />20 The contractor shad follow construction staederds pertaineg to the lateral 5orndo1 fadliry pUsermen* and minimum <br />depth requirements and clearance requrernena of other emeiics. <br />21 A current Stale. County. or Crty permit shat) be maintained on each work see by ttfe contractor Tine contractor <br />snail present such permit upon request <br />22. Any field adplstments to atsulatten of facades, which vary how the dans mat nave been submitted and approved <br />Owing the perttvt application process. shall comply with the bdowtg <br />a. The contractor must stop wore immediately and Conran the faokty Dew of the proposed oranges <br />b The Monty owner's representative shall contact the oty. county or state night -of -way consbudion inspector and <br />provide mem with the details <br />c The ROW Inspector will make a determination on how to proceed. This determinauon may range from approval <br />over the phone or via errhaa to delaying tie project until plans can be updated and appropriate review can be <br />conducted. <br />23 Stake mounted walnilg signs and marker posts 1W53) to be placed where appropnate_ <br />24. AM conduit and fiber is to be installed at the bad of the roadway ROW tailless othewise noted. <br />25, Leave 120' bops (80' tolls at spite points) for mankne fiber in vaults <br />Conduct shah not be placed between the City s traffic sgnal cabinet and connecting traffic sgnaf <br />conduit/poles <br />Cordud must be offset a mammon] of 5 from the base of any traffic signal cabinet, traffic signal <br />pole, or traffic signal pull box <br />Contractor will be required to obtain a permit to work in the ROW (including a traffic control plan) <br />before any physical wolf b b take place <br />Locate flags shag be removed alter the -excavator' has determined the worst is complete <br />IF SIGNAL CONDUITANIRE HAS TO BE CROSSED THE NEW UNE SHALL BE A MINIMUM <br />OF 6' DEEP WHERE CROSSING ANO THE EXSTING SIGNAL CONDUIT SHALL BE <br />POTHOLED AND VERIFIED ON-SITE PRIOR TO BORING <br />
The URL can be used to link to this page
Your browser does not support the video tag.