Laserfiche WebLink
STAKING SHEET - UNDERGROUND <br />Company: OPTK Networks Exchange: Grand Island <br />CONSTRUCTION PROJECT NOTES <br />The State County. (-rty personnel snail be notified a mlmmunl of forty eight (48j hours In advance of 4111.31 project <br />Oprsv4.Aln. <br />a. The utility company and the twntracnrtsl are responsible to nave 41 least one person on the job at al: braes, that to <br />'see supervisor" certified <br />3. The mat ata fo, stud adhere to the curtest perms and COMM. specifications <br />4 Tne ioc_alx.ns of all aehal and underground Lability raoutles may not be nt:toned co the project plans The contractor <br />ns <br />required to contact Me Nebraska and Conrado 811 one 03.11 notification center (dial 811) fonyegnt (483 tours <br />poor to woriong m the aty npnt of way. No exc:ava8cn we be pennted In are area of the underground climes anal <br />all facillOes lave been located and identities to the saOSfaObon of all partes The contactor shah be responsele for <br />prohecime of all underground arid genal uMkees and infrastructure. <br />b. Wnencver underground faett.es ale dose proa.mity to lore proposed pathway location or whenever the vertical <br />location Of the underground tacitly 15 unknown. the contractor shall U. spiv. al neasdres to determine the I0Cat)dn5 <br />of 51,0(1 underground faul.0es. <br />a d tree contractor is randucnng the excavation try rigging from the surface. when in a close proximity to Ole <br />underground facrhtiesthe contactor snail use nand digging. hydro excavating. or air excavating to locate such <br />faaliry. <br />b If vie mntractOr 15 alniatrig me excavation by tunnehrg o bonng. ane contractor stall determine the vertical <br />1ocaMdn of rhe underground tante,/ by pothoring or any other method approved by ala director or public works end <br />:homes <br />d. Project plans snail dimension new facilities being installed <br />7 Unless agreed to in wntrig 11 advance hie depth of instated tapir/ties in city and county row stall be ata minimum <br />as fo0uws <br />• Forty-eight (481 nnde5 n soil <br />D Forty-eight 1481 inches below a projected slope nom Me Bow Ile of a amen at a three 131 horizontal and one (1 j <br />vertical Shope. <br />✓ Pony -eight (481 inches under a roadway measured from Me surface of said roadway o rte top of the nsla8atrOn. <br />d Sony .MO) Inches under a shoran teaer or cheek tl:annel desgn bdndrm or pope. and <br />�. <br />Maintain a minimum . twenty -bur (24j inches of vertical and h,nmontal spaarg horn existing utl4es <br />f Be boned as tar )1.711142 exrstng or proposed cora the a5 pos5lole fo avol0 p0tental Mute conteMS <br />8 <br />All non -street surface matenai5 that are disturbed ey excavation and bav1cloIing operations shall be repaced and <br />restored <br />li. Cay and COWty sweet Surface matenal5 0r.turbed shall be daesbhed. tamped and repaired by .ty or county Innes <br />or approved paving *entracte, <br />10 a sidewa*. wheel craw ramps or any portion of me redeS0an facd.bes are removed or ao5ed. a pedestrian detour <br />small be esta035ned and maintained dunng die erne of the 010504¢ and *re enure pedeol an Molly snail be restored <br />within seventy -ted 1,72 i woo :mess- the contractor provides a nano sartace alternate route approved by the city dr <br />county <br />11 0.11 pedestner. detours and any reconstruction of pedestrian facilities snarl meet current Americans wan Disability <br />Act (ADA) standar,. and opeoficauons. <br />12 All pedestrian demurs stall be pan of an approved Traffic Control Plan ITCP). <br />13 .38 holes made In the streets for the purpose of pedvrni g mom* excavations to locale underground :Woes shall <br />De restored to their onpinal condition min the reinstated oldie fluor, with aft in me ohl(pnal onenuton as the existing <br />Sucher matching emseng pavement surface appearance <br />(4 Wren Ole contractor is net actively working. all equipment, terming. debris, etc. Shall not be placed waren the <br />mango tar area required for sigh) distance of vehicles exiling or eolenrg an ad)aoant property or intersection, <br />AN excavations shall be aoequately fenced and covered when contractor is not present or project Ste telt <br />untended. <br />18. Ne One closures Mooted on arterial strews clump AM and PM peak nouns. <br />17 AL work cone traffic..Mrot. 0x008031 peoestrtan contra measures. shad be in compliance wan the MUTCD and <br />ADA <br />18 The roneacnr shah maanarn a ser of "as ba(r plans on 5de teen almenslonng These plans shall De preserved <br />upon request <br />10. Final "as -bulk plans shall be filed min dry ardor county within 30 days of rhe completion of era pto(ec5 <br />20. The contractor snail follow construction standards perainrnp to the lateral wrndor facsnry placement and minimum <br />dept, requirements and clearance requirements of other laahoes <br />21 A current State. County. or City pemre snail be maintained on each wort ote by the contractor Tne contractor <br />snarl present such permit upon request <br />22 Any hen adjustments to rnstaaabon of fealties, which vary from the pans that nave been submated and approved <br />during the perms application process. shall comply wren the Daemon° <br />• The Contractor must stop work immediately and comact the facility owner ol Me proposed changes <br />o The tadhty owners representative shall contact the chi. county or state ripen -of -way .mnslruction inspecur and <br />provide then) wrm the details. <br />c. The ROW inspector w8 nuke a determmabdn on how to proceed. This detemttnton may range from approval <br />over the phone or vis errod to delaying Inc project and plans can 0e updated and appropriate review can be <br />conducted. <br />23. Stake mounted wamng signs and marker posts (BM53) to be placed wrier, appropnate. <br />24, Ali conduit and fiber is to be installed at the back of me roadway ROW unless otherwise noted. <br />25. Leave 120' loops (BO' tads et spline pontsj tor mainline fib.. vaults <br />Conduit shall not be placed between the City's traffic signal cabinet and connecting traffic signal <br />conduitlpoles. <br />Conduit must be offset a minimum of 5' kom the base of any traffic signal cabinet, traffic signal <br />pole, or traffic signal pull box. <br />Contractor veil be required to obtain a permit to work in the ROW (including a traffic control plan) <br />before any physical work is to take place <br />Locate flags shall be removed after the -excavator" has determined the w0111 is complete <br />IF SIGNAL CONDUIT/WIRE HAS TO BE CROSSED THE NEW LINE SHALL BE A MINIMUM <br />OF 6' DEEP WHERE CROSSING AND THE EXSTING SIGNAL CONDUIT SHALL BE <br />POTHOLED AND VERIFIED ON-SITE PRIOR TO BORING <br />6t1.4801fZ0Z <br />