202117834
<br />said point being the ACTUAL Point of Beginning; thence westerly and
<br />perpendicular to the easterly line of said tract described in Instrument
<br />201402158 and running along the northerly line of said existing sixteen
<br />(16.0) foot wide Electric Easement as described in Instrument 85-001134,
<br />a distance of fifty-six (56.0) feet to the point of termination.
<br />The above-described easement and right-of-way containing a total of
<br />0.026 acres, more or Tess, as shown on the plat dated 7/29/2021, marked
<br />Exhibit "A", attached hereto and incorporated herein by reference,
<br />together with the following rights:
<br />Grantee shall have unrestricted ingress and egress to the above-described
<br />easement and right-of-way for any purpose necessary for the surveying, construction,
<br />inspection, maintenance, repair, replacement, relocation, extension, removal, and
<br />operation of such public utilities and appurtenances. Such rights of ingress and egress
<br />shall be exercised in a reasonable manner.
<br />Grantee shall have the right at any time, to relocate, add, or upgrade such public
<br />utilities and appurtenances connected therewith, in, upon, above, along, over, across,
<br />underneath, or through the easement and right-of-way herein granted. Any such public
<br />utilities and appurtenances placed in, upon, above, along, over, across, underneath, or
<br />through such tract of land shall remain the property of Grantee and may be removed or
<br />replaced at any time.
<br />Grantor and Grantee hereto agree that Grantor shall have the right to hard
<br />surface over the easement and right-of-way and use the easement and right-of-way for
<br />parking and ingress and egress; provided if Grantee needs to survey, construct, inspect,
<br />maintain, repair, replace, relocate, extend, remove, or operate such public utilities and
<br />appurtenance within such easement and right-of-way, the cost of removal and repair of
<br />any hard surfacing placed in, along, or through the easement and right-of-way shall be
<br />paid by Grantor.
<br />Grantee shall have the right to excavate and refill ditches and trenches
<br />necessary for such public utilities and appurtenances; to remove, clear, and keep clear,
<br />trees, bushes, hedges, undergrowth, and/or any other obstructions interfering with the
<br />surveying, construction, inspection, maintenance, repair, replacement, relocation,
<br />extension, removal, and operation of such public utilities and appurtenances. Grantor
<br />acknowledges that landscaping and hard surfacing placed within the boundaries of the
<br />utility easement and right-of-way may be subject to damage, and any maintenance or
<br />replacement cost to such related materials located within the boundaries of the utility
<br />easement are the responsibility of the Grantor.
<br />Grantor shall have the right to use the easement and right-of-way for purposes
<br />not inconsistent with Grantee's full enjoyment of the rights herein granted, provided that
<br />-2-
<br />
|