My WebLink
|
Help
|
About
|
Sign Out
Browse
202105440
LFImages
>
Deeds
>
Deeds By Year
>
2021
>
202105440
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2021 2:53:45 PM
Creation date
6/28/2021 2:51:36 PM
Metadata
Fields
Template:
DEEDS
Inst Number
202105440
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Existing copper PED EtW <br />a 2 CBO. <br />Replace the copper PED <br />with a new Charles PED. <br />Place 2 way future path <br />end a 72 MF through the <br />existing CBO to the <br />DEMARC.(55') <br />Outside Length - 20' <br />Inside Length - 35' <br />3404 W 13th ST <br />Grand Island NE —, <br />Lindsey Lilienthal <br />308-389-8944 <br />Parking <br />2 way future path and a 72 MF <br />Place a new HH and <br />leave a 100' splice loop. <br />04+00 <br />Bore Pit <br />remove and <br />replace 35f3' <br />of concrete. <br />W. 13th St <br />01+57 <br />EXHIBIT "A" 2021/6/3 <br />N <br />S12 711N RIOW <br />Hall Co. NE <br />7 <br />D <br />t9 <br />0 <br />Parking <br />Locate and expose <br />existing HH per records. <br />was not able to located m <br />the field due to several <br />inches of snow. <br />***Special Instructions*** <br />Conduit shall not be placed between the City's traffic <br />signal cabinet and connecting traffic signal <br />conduit/poles. Conduit must be offset a minimum of <br />5' from the base of any traffic signal cabinet, traffic <br />signal pole, or traffic signal pull box. <br />Contractor will be required to obtain a permit to work <br />in the ROW (including a traffic control plan) before <br />any physical work is to take place. Locate flags shall <br />be removed after the "excavator' has determined the <br />work is complete. <br />-IF SIGNAL CONDUIT/WIRE HAS TO BE CROSSED <br />THE NEW LINE SHALL BE A MINIMUM OF 6' DEEP <br />WHERE CROSSING AND THE EXSTING SIGNAL <br />CONDUIT SHALL BE POTHOLED AND VERIFIED <br />ON-SITE PRIOR TO BORING <br />CTL copper PED <br />UNITE'S HH <br />7 way future path <br />and a 72 MF <br />4- - - - - - <br />0 <br />1 <br />W. 13th St <br />ADDRESS: 3404 W 13th St, Grand Island NE <br />PERMIT - City of Grand Island NE Call before you dig dlaI8U <br />LOCATE AU. UTILITIES <br />BEFORE CONSTRUCT. <br />NTS <br />LUMEN' <br />ENGINEER: LUMEN - CATHY SAIGE BASGUEZ <br />DRAFTED BY: PEARCE SERVICES - Al Gibbs <br />PHONE: 402-616-1897 <br />REVISION: <br />SHEET: 1 OF 1 <br />JOB#: 14.828611 <br />GEO: <br />CLLI: GDIBNENW <br />DATE: 1128/2021 <br />PEARCE <br />--S)SEAVICES <br />Ott(AOTZOZ <br />
The URL can be used to link to this page
Your browser does not support the video tag.