Laserfiche WebLink
202104631 <br />1. Paving. The Subdivider agrees to waive the right to object to the creation <br />of any paving or repaving district for Capital Avenue where it abuts the subdivision. <br />2. Water. Public water is available to the subdivision, and all new structures <br />requiring service shall be connected to such sanitary sewer supply. <br />3. Sanitary Sewer. Public sanitary sewer is available to the subdivision, and <br />all new structures requiring service shall be connected to such sanitary sewer supply. <br />4. Storm Drainage. The Subdivider agrees to provide and maintain positive <br />drainage from all lots, according to the drainage plan, so that storm drainage is conveyed to a public <br />right-of-way or to other drainage systems so approved by the Director of Public Works. If the <br />Subdivider fails to grade and maintain such drainage the City may create a drainage district to <br />perform such work. The Subdivider agrees to waive the right to object to the creation of any drainage <br />district benefitting the subdivision. <br />5. Sidewalks. Immediate sidewalk construction adjacent to Capital Avenue shall <br />be waived. However, the sidewalks shall be constructed when the property owner is directed to do <br />so by the City Council. In the event a Street Improvement District is created to pave any public street <br />in the subdivision, the Subdivider agrees to install public sidewalks within one year of the <br />completion of such street improvement district in accordance with the City of Grand Island Sidewalk <br />Policy. <br />6. Accessory Buildings Moving from Lot 2 to Lot 1. The Subdivider certifies <br />that the old garage/storage building immediately north of Lot 2 of Iglesia Eben-Ezer Subdivision and <br />within the building setback of Lot 1 Iglesia Eben-Ezer Subdivision has been removed from said Lot <br />1 or moved out of the required setback and that all necessary permits for demolition or moving have <br />-3- <br />