Laserfiche WebLink
•MW6 <br />•MW61 <br />SVEB •MW6D <br />MW4. <br />• <br />MWS <br />T <br />N <br />Grand Island <br />Abstract, Escrow, & <br />Title Co. <br />Legend <br />•MW6 - Monitoring Wall Location <br />- MWi to MO/3 Destroyed <br />® - Proposed Soil Vapor Eotroction Well <br />SVE Four SVE Wells Proposed with on estimated <br />75 feet radius of influence from each well <br />®Ac - Proposed Air Sporge Wel <br />Eight AS Weds Proposed <br />II- Proposed Remedial Enclosure <br />Proposed Remedial Trench <br />ND - Non -Detect <br />- Benzene Equipotential Line (in ppb) <br />7,00 --(Dashed Where Inferred) <br />-OH— -Overhead Power/Overheod Telephone <br />- W — -Water Line <br />-5a— -Sanitary Sewer <br />• -BT— -Buried Telephone <br />MW7 -BE— -Buried Electric <br />- G — -Goo Line <br />•PP -Power Pole <br />•MH -Manhole <br />•FH -Fire Hydrant <br />•GM -Gas Meter <br />•LP -Light Pole <br />Scale In Feet <br />0 <br />20 40 <br />Remedial wen installation phase is anticipated to take 3-4 doys to complete. <br />Wells will be completed in 8" Diameter traffic rated manholes at the surface. <br />AS1 <br />Proposed Traffic Control <br />for Drilling Operations <br />Grand Island Oil <br />Grand Island, NE <br />Remedial Action Plan <br />CGP Project #15724 <br />Prepared By: LD Date: 08-24-2020 <br />Reviewed By: MK Dote: 08-24-2020 <br />Figure 3a <br />CGP, Inc. PO Box 2.3, Wohoo, NE 68066 <br />J60C0Tgog <br />