Laserfiche WebLink
202100951 <br />Subdivider agrees to install public sidewalks within one year of the completion of such street <br />improvement district in accordance with the City of Grand Island Sidewalk Policy. <br />6. Front Yard Setbacks. The short side of each lot facing a street shall be <br />considered the front yard for setback purposes. The front yard set back for Lot 29 shall be applied to <br />both the north and northeasterly property lines along along Schmidt Circle. <br />7. Easements. Any easements shall be kept free of obstructions and the <br />Subdivider shall indemnify the City for any removal or repair costs caused by any obstructions. In <br />addition, the duty to maintain the surface of any easements to keep them clear of any worthless <br />vegetation or nuisance shall run with the land. <br />8. Engineering Data. All final engineering plans and specifications for public <br />improvements shall bear the signature and seal of a professional engineer registered in the State of <br />Nebraska and shall be furnished by the Subdivider to the Department of Public Works for approval <br />prior to contracting for construction of any improvements. Inspections of improvements under <br />construction shall be performed under the supervision of a professional engineer registered in the <br />State of Nebraska, and upon completion shall be subject to inspection and approval by the <br />Department of Public Works prior to acceptance by the City of Grand Island. An "as built" set of <br />plans and specifications including required test results bearing the seal and signature of a <br />professional engineer registered in the State of Nebraska shall be fled with the Director of Public <br />Works by the Subdivider prior to acceptance of these improvements by the City. <br />9. Warranty. The undersigned owner, as Subdivider, warrants that it is the <br />owner in fee simple of the land described and proposed to be known as COPPER CREEK ESTATES <br />5 <br />