C) <br />STAKING SHEET - UNDERGROUND Company: OPTK Networks Exchange: Grand Island <br />CONSTRUCTION PROJECT NOTES <br />1. The State. County. City personnel shag be notified a minimum of forty eight (48) hours in advance of initial project <br />construction. <br />2. The utility company and the contractors) are responsible to have at least one person on the job at all tines. that is <br />"site supervisor' certified. <br />3. The contractor shall adhere to the current permit and contract specifications - <br />4. The locations of all aerial and underground utility facilities may not be indicated on the project plans. The contractor <br />is required to contact the Nebraska and Colorado 811 one call notification center (dial 811) forty-eight (48) tours <br />prior to working in the city right of way. No excavation wil be permitted in the area of the underground utilities until <br />all facilities have been located and identified to the satisfaction of all parties. The contractor shag be responsible for <br />protection of all underground and aerial utilities and infrastructure. <br />5- Whenever underground facilities are in close proodmity b the proposed pathway location or whenever the vertical <br />location of the underground facility is unknown, the contractor shall use special measures to determine the locations <br />of such underground facilities. <br />a. If the contractor is conducting the excavation by digging from the surface. when in a dose proximity to the <br />underground facilities, the contractor shag use hand digging, hydro excavating, or air excavating to locate such <br />facility. <br />b. If the contractor is conducting the excavation by tunneling or boring, the contractor shall determine the vertical <br />location of the underground facility by potholing or any other method approved by the director of public works and <br />utilities - <br />5. Project plans shag dimension new facilities being iastailed <br />7. Unless agreed to in writing in advance the depth of installed facilities in city and county row shall be at a minimum <br />as follows: <br />a. Forty-eight (48) inches in soil <br />b. Forty-eight (48) inches below a projected slope from the flaw line of a ditch at a three (3) horizontal and one (1) <br />vertical slope. <br />c- Forty-eight (48) inches under a roadway measured from the surface of said roadway to the top of the installation. <br />d. Sixty (60) inches under a storm water or creek channel design bottom or pipe. and <br />e. Maintain a minimum of twenty -Dour (24) inches of vertical and horizontal spacing from existing utilities- <br />f- Be located as far from the existing or proposed curb fine as possible to avoid potential future conflicts. <br />8. All non -street surface materials that are disturbed by excavation and backfilling operations shall be replaced and <br />restored - <br />8. City and county street surface materials disturbed shall be backfilled, tamped and repaved by city or county fomes <br />or approved paving contractor. <br />10. If sidewalk, wheel chair ramps or any portion of the pedestrian factities are removed or dosed, a pedestrian detour <br />shall be established and maintained during the time of the closure and the entire pedestrian facility shalt be restored <br />within seventy-two (72) hours, unless the contractor provides a hard surface alternate route approved by the city or <br />county_ <br />11. All pedestrian detours and any reconstruction of pedestrian facilities shag meet current Americans with Disability <br />Act (ADA) standards and specifications. <br />12. All pedestrian detours shag be part of an approved Traffic Control Plan (TCP) - <br />13. All holes made in the streets for the purpose of performing vacuum excavations to locate underground utilities shall <br />be restored to their original condition with the reinstated core flush with and in the original orientation as the existing <br />surface matching existing pavement surface appearance. <br />14. When the contractor is not actively working: all equipment. fencing. debris. etc. Shall not be placed within the <br />triangular area required for sight distance of vehicles exiting or entering an adjacent property or intersection. <br />15. AN excavations shag be adequately fenced and covered when contractor is rot present or project site left <br />unattended. <br />16. No lane closures allowed on arterial streets during AM and PM peak hours. <br />17. AN work zone traffic control, including pedestrian control measures. shall be in compliance with the MUTCD and <br />ADA- <br />18. <br />DA18. The contractor shag maintain a set of "as buir pians on site with cknensioning- These plans shall be presented <br />upon request <br />19. Final "as -built" plans shag be filed with city and/or county within 30 days of the completion of the project. <br />20. The contractor shag fallow construction standards pertaining to the lateral corridor facility placement and minimum <br />depth requ kv ments and clearance requirements of other facilities. <br />21. A current State. County. or City permit shall be maintained on each work site by the contractor. The contractor <br />shall present such permit upon request <br />22. Any field adjustments to instalation of facilities. which vary from the plans that have been submitted and approved <br />during the permit application process, shall comply with the following: <br />a- The contractor must stop work immediately and contact the fainly owner of the proposed changes_ <br />b. The facility owners representative shag contact the city. county or state right -0f -way construction inspector and <br />provide them with the details - <br />c. The ROW inspector will make a determination on how to proceed. This dewirmination may range from approval <br />over the phone or via email to delay -ting the project until pians can be updated and appropriate review can be <br />conducted. <br />23. Stake mounted waning signs and marker posts (BU53) to be placed where appropriate. <br />24. AN conduit and fiber is to be installed at the back of the roadway ROW unless otherwise noted. <br />25. Leave 120' loops (W tails at spice points) for mainline fiber in vaults <br />