My WebLink
|
Help
|
About
|
Sign Out
Browse
202007557
LFImages
>
Deeds
>
Deeds By Year
>
2020
>
202007557
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2020 3:43:29 PM
Creation date
10/5/2020 3:39:44 PM
Metadata
Fields
Template:
DEEDS
Inst Number
202007557
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
® <br />UTILITIES UPON THE REQUEST OF THE CONTRACTOR. NO EXCAVATION <br />WILL BE PERMITTED N THE AREA OF THE UNDERGROUND UTILITIES <br />® <br />UNTIL ALL SUCH FACILITIES HAVE BEEN LOCATED AND IDENTIFIED TO <br />THE SATISFACTION OF ALL PARTIES. THE CONTRACTOR SHALL BE <br />RESPONSIBLE FOR PROTECTION OF ALL UNDERGROUND AND AERIAL <br />UTILITIES AND CONSTRUCTIONS. <br />2 UNLESS AGREED TO N WRITING N ADVANCE BY THE CITY, THE DEPTH <br />OF INSTALLED FACILITIES SHALL BE, AT A MINIMUM, AS FOLLOWS: <br />y <br />A. FORTY-TWO (42) INCHES N SOIL. <br />C <br />C <br />B FORTY-TWO (42) INCHES BELOW A PROJECTED SLOPE FROM THE <br />O <br />FLOW LINE OF A DITCH AT A THREE (3) HORIZONTAL AND ONE (1) <br />g <br />4. <br />VERTICAL SLOPE. <br />.m <br />C. FORTY-EIGHT (48) INCHES UNDER A ROADWAY MEASURED FROM <br />THE SURFACE OF SAID ROADWAY TO THE TOP OF THE <br />4 <br />INSTALLATION. <br />D. FORTY-EIGHT (48) INCHES UNDER A STORM WATER OR CREEK <br />CHANNEL DESIGN FLOW LINE, AND <br />E MAINTAIN A MINIMUM OF 24" OF VERTICAL 8 HORIZONTAL <br />SPACING FROM EXISTING UTILITIES. <br />C <br />3, <br />ALL POTHOLES N SIDEWALK PANELS WILL REQUIRE FULL PANEL <br />REPLACEMENT. <br />g <br />4. <br />ANY CUT OR POTHOLE N A CONCRETE STREETS PANEL WILL REQUIRE <br />C <br />FULL PANEL REPLACEMENT. <br />Al <br />5. <br />ANY CUT OR POTHOLE N AN ASPHALT STREET LANE WILL REQUIRE SEAM <br />TO SEAM ASPHALT MILLING AND REPLACEMENT. <br />I\ <br />C <br />& <br />COMMUNICATIONS CONDUITS SHALL BE BORED TO MAINTAIN A MINIMUM <br />SEPERATION OF THREE (3) FEET FROM WATER MAIN INFRASTRUCTURE. <br />7. <br />THERE WILL BE NO STREET OR LANE CLOSURES ALLOWED DURING <br />CONSTRUCTION. <br />2 FIELD VERIFY ALL NEWLY INSTALLED CABLE/MESSENGER CLEARANCES ARE <br />CONSTRUCTED N ACCORDANCE WITH THE NESC. <br />3. ALL ABANDONED BOLT HOLES ARE TO BE TREATED WITH WOOD PRESERVER <br />AND PLUGGED WITH SIMILAR MATERIALS AS STATED N THE CONTRACT. <br />4. GROUNDING TO BE INSTALLED AS STATED N THE CONTRACT. <br />
The URL can be used to link to this page
Your browser does not support the video tag.