Laserfiche WebLink
P <br />A <br />R <br />K <br />N <br />G <br />L <br />0 <br />T <br />MH 419. R&R 4'X4' <br />PAVEMENT. LEAVE <br />100' COIL OF FIBER <br />IN MH. <br />SEC 16 <br />TN 9N <br />R 11W <br />HALL <br />COUNTY <br />0 <br />+ <br />0 <br />0 <br />N <br />G <br />R <br />E <br />E <br />N <br />C <br />H <br />S <br />T <br />BORE AU. DRIVEWAYS, <br />STREETS AND CULVERTS <br />MINIMUM 48". BORE <br />IN ROW MINIMUM 30". <br />STAY WITHIN 5. OF <br />BACK OF ROW. <br />R <br />0 <br />w <br />BORE 7 WAY <br />EXHIBIT "A" 2020/7/28 <br />FUTUREPATH AND <br />72 MICROFIBER <br />PLACE FIBER PED. <br />LEAVE 100' LOOP OF <br />FIBER <br />1 <br />5 <br />PED 917W3rd <br />IPED 920 2nd <br />ROW — <br />R <br />0 <br />W <br />PARKING LOT <br />BORE 2' CONDUIT <br />AND 2 WAY <br />FUTUREPATH WITH <br />72 MICROFIBER <br />'Conduit shad not be �^ <br />placed between the City's R&R SIDEWALK <br />trafSc signal cabinet and PANEL FOR <br />comectIng trine signal BORE PIT. CORE <br />conduit/poles Conduit DRILL BUILDING <br />must be offset a minimum <br />of 5' from die base of any FOR CONDUIT. <br />traffic signal cabinet, traffic <br />Opel pole, or traffic signal <br />put box - <br />-Contractor will be required <br />to obtain a permit to work M <br />the ROW (including an <br />approved traffic control plan) <br />before any physical work Is <br />to take place Locate flags <br />shall be removed after the <br />"excavator has determined <br />the work is complete.' <br />PAVED ALLEY <br />STRAP 2 WAY <br />FUTUREPATH TO <br />EXISTING CABLES <br />ALONG WALL IN <br />BASEMENT <br />2+44 <br />D <br />R <br />V <br />E <br />T <br />H <br />R <br />0 <br />U <br />G <br />H <br />— - ROW <br />OP 2+71 <br />920 W 2nd ST <br />LCON: YASMINE METTEER <br />308-389-8923 <br />IGISCLAIMER <br />UTILITY LOCATIONS <br />SHOWN ON THIS <br />DRAWING ARE <br />APPROXIMATE AND <br />SHOULD NOT BE SOLEY <br />RELIED UPON TO <br />LOCATE <br />UNDERGROUND <br />FACILITIES THE <br />CONTRACTOR SHALL <br />BE FULLY <br />RESPONSIBLE FOR <br />COMPLIANCE WITH <br />STATEWIDE AND/OR <br />LOCAL AREA 'ONE <br />CALL"PROGRAMS AND <br />REQUIREMENTS <br />LEAVE 100' COIL OF <br />FIBER AT MPOP <br />1 <br />LINCOLN HIGHWAY US 30, 2nd ST <br />ADDRESS: 920 W 2nd ST, GRAND ISLAND, NE 68501 <br />IPERNIIT <br />II <br />CITY <br />NEBRASKA 1 GUM <br />LOCATE ALL UTIUTI :S <br />BEFCftE OONSTRUCT. <br />NIS <br />3431 EER CENTURY U N n TERRY DONAHUE 402-572-5857 <br />DRAFTED B1^ PENCE Sf3aAr.EB - GREG SALO <br />!K7f€ 402-250-4105 <br />REVISION <br />SNEET' 1 OF 1 <br />NOT TO SCALE <br />106x <br />N.765166 <br />LCON: YASMINE METTEER 308-389.8923 <br />OL GDISNENW <br />WE 1-16-2020 <br />MVIOES <br />• <br />