Laserfiche WebLink
P J N SHEET NO. <br />017-0078 1 F.6 <br />Da to : 0 7 1 220 20 -, I@9iert IM <br />515 <br />r <br />�" <br />r <br />■ <br />Hwi Sale 1 ; 50 meed: GIS <br />.'1 <br />PROJECT: 1864B -CHIEF INDUSTRIES <br />- <br />` <br />3935 WESTGRE ROAD <br />" <br />Bieltrrp Cly d Orad Nord Pole <br />t <br />olsson a <br />�t <br />.f, <br />z <br />Ignite <br />-b <br />t <br />IWATE a6T1Y M <br />0 <br />T <br />r <br />0 <br />Be�tA My dGrad lelWd Pole <br />T <br />1 <br />` <br />1 '•1 <br />�'� �� <br />0 2s 5D <br />i <br />UPN Aerial Fbar <br />u) <br />Put Box n8-1 - s' Soullh 8 3' West d Pole <br />1 Ea. UPN PUN BOK <br />4 <br />r9rt•tMr1<— <br />I <br />80 dab SM <br />uj <br />Houle Mand uu11y <br />W <br />sse Prerioue <br />PRIOR TO CONSTRUCTION: <br />CN dGra� Idsd PtTle <br />CALL 811 FOR LOCATION OF <br />W <br />Houle Nand PadtaaMd <br />F <br />; <br />ELECTRIC, GAS MAINS, CABLE <br />- . <br />• <br />� UPN paid F{per <br />TELEVISION AND OTHER UTILITIES. <br />1 <br />?5' Flom <br />R <br />EXISTING UNDERGROUND AND <br />Nnold � <br />CIS• <br />351rdl.7 B,96 .TW <br />ES AND <br />Ar W DralrMpe <br />73' d1.5- B. B6 SM. TW <br />Inn <br />MI Mu. 10' Below Etotdrg Grade <br />DRAINAGE STRUCTURES ES HAVE <br />Q <br />Mh . 9 Below E>Ntlnp Grade <br />To hmid 0ordlk2c Wth Hoed Oortmae Clara 6v�np d Grwd blend Pbb <br />BEEN PLOTTED FROM <br />< <br />To Awad Coride Whh Road Oondnxdm <br />From Poi Boa b-1 b Ptl Bar 6-2SIC <br />Fran P11— b PUIBoa <br />UPN <br />AVAILABLE INFORMATION AND <br />THEREFORE, THEIR LOCATIONS <br />MUST BE <br />F <br />23 Flom <br />APPROXIMATE ONLY IT E THE <br />RESPONSIBILITY OF THE <br />RaJM Aroand <br />INDIVIDUAL CONTRACTORS TO <br />Put Efa*d <br />; <br />EXACTLY LOCATE AND PROTECT <br />1 Ea LI PN Put Bor <br />Pale #1 <br />EACH EXISTING Y BEFORE <br />BO' d 96 <br />- - -- — <br />- - Owner: City of Grand Island <br />AND DURING ACTUAL <br />UPN Overlash to Ex UPN <br />CONSTRUCTION. <br />dg8 SM <br />(` <br />CONSTRUCTION SHALL MEET CITY <br />18 of Overhead 96 SM <br />OF GRAND ISLAND STANDARD <br />• <br />Overtash Existing UPN <br />CONSTRUCTION SPECIFICATIONS <br />• �+ <br />Tie Into Existing UPN Slack Loop A <br />AND STANDARD PLANS. <br />100 of 96 SM (Coil) <br />Bdairp UPN Slack Loop A <br />5 ' dW 0, W SM, TW <br />apt CI y/� <br />Zi <br />TOO Maid Carllcle Wit Road ConetrucGon <br />Flom Put Baa 84 b Pole #1 <br />e <br />t3r <br />4 GREGORY T. p <br />RA� U"b <br />i ox <br />u"PN Pry Bomar <br />SEIB <br />a0'dm sM <br />Edo AerlelMM Old PoWd to Be <br />E-15150 <br />Removed. Future PmjodID Show Hektcetrot <br />Into Pal Barb -8. <br />5 <br />OF tit <br />FIBER DESIGN <br />