Laserfiche WebLink
EXISTING HH <br />00+00 <br />Zia ONV11:13AO <br />1k <br />--�-40' RIW-- <br />00+13 <br />BORE 7 WAY FUTURE <br />PATH AND JET IN A 72 <br />MF, 13' SOUTH FROM <br />THE EXISTING HH TO <br />THE BORE PIT. <br />BORE 7 WAY FUTURE <br />PATH AND JET IN A <br />72MF, 234' EAST FROM <br />THE BORE PIT TO THE <br />NEW FIBER PED. <br />IN <br />3341 W STATE ST, GRAND ISLAND NE <br />MINDY BROWN <br />308-850-0416 <br />EASEMENT-_ - _ _. - -OP+47 <br />BORE AT A 48" MINIMUM DEPTH <br />UNDER ALL ROADS, DRIVEWAYS <br />AND SIDEWALKS <br />03+07 <br />PLACE A NEW FIBER <br />PED AND LEAVE A <br />SPLICE LOOP. <br />INSIDE LENGTH - 25' <br />OUTSIDE LENGTH - 35' <br />CUSTOMER WILL PLACE A 50' <br />NEW 2" CONSUIT FROM THE <br />DEMARC TO THE MEET POINT. <br />PLACE 2 WAY FUTURE <br />THAT AND A 72MF <br />THROUGH THE NEW <br />CUSTOMER PLACED 2" <br />CONDUIT. THE <br />DISTANCE FROM THE <br />PED TO THE NEW <br />EQUIP. IS 60'. <br />EXHIBIT "A"- 2020/1/13 <br />N <br />S12 T11N R1OW <br />HALL CO. NE <br />ADDRESS: 3341 W STATE ST, GRAND ISLAND NE <br />PERMIT - CITY OF GRAND ISLAND Cal before you dig dial 811 <br />LOCATE ALL UTILITIES <br />BEFORE CONSTRUCT. <br />NTS <br />Centurylink• <br />ENGINEER: CENTURY LINK CATHY SAIGE BASQUEZ <br />DRAFTED BY: PEARCE SERVICES -AI Gibbs <br />PHCNE 402-616-1897 <br />REVISION: <br />SHEET 1 OF 1 <br />JOB#: N.653649 <br />GEO <br />CLLI: GDISNENW <br />DATE: 12-20-2019-)5ERvica3 <br />,PEARCE <br />�ZE000Z0g <br />