Laserfiche WebLink
PROJECT NO. SHEET NO. <br />017-0078 F.2 <br />Date: 08 19 hawk: <br />Checked: STS <br />• <br />Horz. Scale 1:50 Approved: JPD <br />PROJECT: 21354 -US CELLULAR <br />GRAND ISLAND - CENTRAL <br />Olsson <br />r a <br />UM" <br />g <br />a <br />0 25 50 <br />U <br />,1T <br />f <br />UPN PullBox A <br />IO�nslrM�r��. <br />80' of 144 SM Coil <br />�MIIAIM� <br />m W <br />W <br />a <br />„ , <br />PRIOR TO CONSTRUCTION: <br />Cn See Previous Sheet <br />1.5" B, 144 SM, TW <br />� <br />--.t»"— , � �, <br />,: �' <br />CALL 811 FOR LOCATION OF <br />W <br />Install Under Sidewalk^* <br />" <br />UNDERGROUND TELEPHONE, <br />< z60 <br />of 1.5" B, 144 SM, TW <br />ELECTRIC, GAS MAINS, CABLE <br />J <br />Colle a $trees <br />= <br />From Pull Box 2-1 to UPN Pull Box A <br />TELEVISION AND OTHER UTILITIES. <br />EXISTING UNDERGROUNDA ND <br />OVERHEAD UTILITIES AND <br />a <br />DRAINAGE STRUCTURES HAVE <br />Pull Box 2-1 - Approx. 3' South of BOC <br />UPN Pull Box <br />BEEN PLOTTED FROM <br />- <br />Route Around Manhole <br />, <br />80' of 144 SM Coil <br />AVAILABLE INFORMATION AND <br />, <br />THEREFORE, THEIR LOCATIONS <br />MUST BE CONSIDERED <br />Route Around Transformer <br />APPROXIMATE ONLY. IT IS THE <br />a <br />RESPONSIBILITY OF THE <br />o <br />ConduitClearance Minimum 3 <br />INDIVIDUAL CONTRACTORS TO <br />From Inlet (Typ.) <br />EXACTLY LOCATE AND PROTECT <br />Route Around Water Valve <br />EACH EXISTING UTILITY BEFORE <br />AND DURING ACTUAL <br />S <br />CONSTRUCTION. <br />CONSTRUCTION SHALL MEET CITY <br />y <br />OF GRAND ISLAND STANDARD <br />CONSTRUCTION SPECIFICATIONS <br />AND STANDARD PLANS. <br />8 <br />�P V/ <br />JOHN PAUL m <br />o <br />0- DIEDIKER 9 <br />E-16912 <br />qTF <br />OF NEgPPS <br />FIBER DESIGN <br />