Laserfiche WebLink
M <br />0 <br />ct <br />PROJECT NO. SHEET NO. <br />017-0078 F. <br />Date: 08\26\2019 �FhFked: STS <br />Horz. Scale 1 : 50 pved: JPD <br />PROJECT: 21354—US CELLULAR <br />GRAND ISLAND — CENTRAL <br />olsson <br />Unite, <br />d <br />c <br />m <br />a <br />d <br />3 <br />0 <br />0 <br />m <br />Z <br />v<:... <br />0 25 50 <br />3 <br />N <br />UPN Pull Box C <br />80' of 144 SM Coil <br />U <br />10' North of BOC <br />�... Pu1118Ea. <br />"a"=no� <br />UPN P Box <br />80' of 144 SM Coi <br />h , s <br />a <br />m - <br />PRIOR TO CONSTRUCTION: <br />Route Around Traffic Signal Pole <br />CALL 811 FOR LOCATION OF <br />Route Around Pull Box <br />357' of 1.5" B. 144 SM, TW <br />UNDERGROUND TELEPHONE, <br />From UPN Pull Box C to Pull Box 5-1 <br />69' of 1.5" B, 144 SM, TW <br />ELECTRIC, GAS MAINS, CABLE <br />m <br />Install Under Sidewalk <br />W. <br />State Street <br />From Pull Box 5-1 to Pull Box 5-2 <br />TELEVISION AND OTHER UTILITIES. <br />a <br />Conduit Clearance mum 3' <br />EXISTING UNDERGROUND AND <br />s <br />From Inlet (Typ.) <br />OVERHEAD UTILITIES AND <br />a <br />DRAINAGE STRUCTURES HAVE <br />E <br />" <br />BEEN PLOTTED FROM <br />AVAILABLE INFORMATION AND <br />a <br />" <br />THEREFORE, THEIR LOCATIONS <br />MUST BE CONSIDERED <br />a <br />Pull Box 5-2 - Approx. 11'North & 7' West of BOC <br />APPROXIMATE ONLY. IT IS THE <br />1 Ea. UPN Pull Box <br />RESPONSIBILITY OF THE <br />8 <br />80' of 144 SM Coil <br />INDIVIDUAL CONTRACTORS TO <br />EXACTLY LOCATE AND PROTECT <br />e <br />' <br />EACH EXISTING UTILITY BEFORE <br />- <br />AND DURING ACTUAL <br />uf7l, <br />CONSTRUCTION. <br />? <br />t <br />V <br />CONSTRUCTION SHALL MEET CITY <br />OF GRAND ISLAND STANDARD <br />' <br />06 <br />CONSTRUCTION SPECIFICATIONS <br />AND STANDARD PLANS. <br />• <br />W <br />V <br />�� <br />LL <br />Z <br />�9W� <br />h <br />r <br />JOHN PAUL n <br />o DIEDIKER D <br />E-16912 <br />v <br />ca <br />OF NE16 <br />FIBER DESIGN <br />