Laserfiche WebLink
y aaM <br />1� <br />LEGEND OF SYMBOLS <br />EXISTING CONDUIT <br />EXISTING AERIAL FIBER <br />BORED CONDUIT....................................................................1 <br />TRENCHED CONDUIT................................................................... <br />NEW AERIAL FIBER <br />NEW AERIAL FIBER, OVERLASH <br />MESSENGER CABLE <br />NO CITY RECIPIENT FIBER........................••••.•.•.•.•.•.•.•.•...•.•......... <br />EXISTING CONDUIT — — — — — — — — — — — — — — — — — — — — — — ------ <br />EXISTING SIGNAL CONDUIT <br />ROW <br />NEW PULL BOX <br />NEW PEDESTAL Z� <br />NEW POLE <br />9 <br />NEW DOWN GUY —I <br />` NEW RISER <br />NEW SLACK SPAN 69 <br />NEW SLACK LOOP CO <br />EXISTING PULL BOX ❑ <br />EXISTING PEDESTAL <br />EXISTING UTILITY POLE Q <br />l EXISTING SLACK LOOP CO <br />g EXISTING SPLICE CASE <br />EXISTING MANHOLE O <br />a <br />ESIGN ...�.� <br />8 <br />BARRICADE <br />DRUM OO <br />s <br />BORE PIT ❑ <br />dARROW PANEL C C C <br />CABLE AND CONDUIT DESIGNATIONS <br />B is Conduit Bored (ie..3" B) <br />C is conductor (ie.. 3/C) <br />CC is Coaxial Cable <br />CCC is Camera Control Cable <br />CDC is Camera Detector Cable <br />CG is Circuit Ground <br />CPC is Camera Power Cable <br />DB is Direct Buried <br />DMSC is Dynamic Message Sign Cable <br />EDC is Emergency Detector Cable <br />ETW is Electric Tracer Wire <br />EX is Existing <br />FI is Fabric Interdud <br />FLC is Fiber Locate Cable <br />FTW is Fiber Tracer Wire <br />INS is Install <br />INT is Intraduct <br />LC is Lead -In Cable <br />M is Conduit Mounted (ie..2" M) <br />MB is Main Line Conduit Group Bored (6) 1 1/4" <br />MM is Multi Mode Fiber Cable <br />MT is Main Line Conduit Group Trenched (6) 1 1/4" <br />NO is Number <br />OH is Over Head - <br />PR is Pair of Communication (ie.. 6 PR) <br />REL is Relocate <br />REM is Remove <br />FIGS is Rigid Galvanized Steel <br />SC is Service Cable <br />SL is Street Light <br />SM is Single Mode Fiber Cable <br />T is Conduit Trenched (ie..3" T) <br />TW is Tracer Wire (black or green) <br />PCA243636-OOM <br />POLYMER CONCRETE ASSEMBLY <br />W . b' . 36' <br />sous la s�wuc tac� - <br />rAa. e°A6 9rr16.r n.IrvL.r lev.op <br />r Ant. d nt6.r1 Vrrre <br />LOAD RATMOe <br />k..Mwootrove P I0 Lee. 6r...A <br />°. <br />c1— I. <br />WUC 16 <br />ASTM C 657 <br />• AIaSVSCTE n <br />sEATL4=L <br />LJ601,fhA APP -1 <br />• sv:+.. w6r eon <br />n° , <br />I. <br />AYI..IPMrt. M.•Wr <br />oe.61Aw6 anM..wA6 <br />1poWa)6 I tet}/ <br />Inside Denensoft <br />3) WW 21 1116' 3r <br />UPN PULL BOX, 24"X36"X36" <br />REV A t <br />AVOID WALK OR DRIVE <br />ITEM <br />UNIT <br />QUANTITY <br />In <br />LF. <br />¢w X <br />TRACER WIRE <br />j u 8 <88 °•6 �°.°°; <br />N ��°•°.qog��$;�� <br />CUT PARALLEL 6e�,°°S, °aa• e'er <br />TO LID •'�8' ROCK <br />/ <br />ROCK .......... .; <br />HOSE CLAMPS ••� .j.g $ \ FABRIC <br />FABRIC ;°• °° <br />°'ab_•ea'8e^• <br />/ <br />.sag°�°e`°°°�,a°°4M1� •�� was^. <br />a8 :6a�d • baa,$ - <br />_. <br />• 0 yyoo <br />• <br />•'�o°o <br />,gam ° <br />ro°•°°��•Ro oPoB •�oeo ofo� <br />FIBER, 144 SM, UNDERGROUND <br />LF. <br />UPN PULL BOX INSTALLATION <br />SUMMARY OF QUANTITIES <br />ITEM <br />UNIT <br />QUANTITY <br />CONDUIT, 1.5" B <br />LF. <br />514 <br />TRACER WIRE <br />LF. <br />514 <br />BUILDING ENTRANCE <br />EA. <br />1 <br />UPN PULL BOX <br />EA. <br />2 <br />FIBER, 144 SM, UNDERGROUND <br />LF. <br />514 <br />FIBER 144 SM UNDERGROUND SLACK STORAGE <br />LF. <br />340 <br />*ALL FIBER (UNDERGROUND/AERIAL) AND CONDUIT (BORE] 1RENCH/PLOW) lauANTITIES ARE <br />MEASURED AS LINEAL FEET BETWEEN CENTERS OF PULL BOXES, CABINETS, AND POLES. <br />QUANTITIES DO NOT ACCOUNT FOR ELEVATION CHANGE OR SLACK.* <br />PROJECT NOTES <br />1. THE LOCATIONS OF ALL AERIAL AND UNDERGROUND UTILITY <br />FACILMES MAY NOT BE INDICATED ON THESE PLANS. UNDERGROUND <br />UTILITIES, WHETHER SHOWN OR NOT, WILL BE LOCATED AND FLAGGED <br />BY THE UTILITIES UPON THE REQUEST OF THE CONTRACTOR. NO <br />EXCAVATION WILL BE PERMITTED IN THE AREA OF THE UNDERGROUND <br />UTILITIES UNTIL ALL SUCH FACILITIES HAVE BEEN LOCATED AND <br />IDENTIFIED TO THE SATISFACTION OF ALL PARTIES. THE CONTRACTOR <br />SHALL BE RESPONSIBLE FOR PROTECTION OF ALL UNDERGROUND AND <br />AERIAL UTILITIES AND CONSTRUCTIONS. <br />2. UNLESS AGREED TO IN WRITING IN ADVANCE BY THE CITY, THE DEPTH OF <br />INSTALLED FACILITIES SHALL BE, AT A MINIMUM, AS FOLLOWS: <br />A. FORTY-TWO (42) INCHES IN SOIL, <br />B. FORTY-TWO (42) INCHES BELOW A PROJECTED SLOPE FROM THE FLOW LINE <br />OF A DITCH AT A THREE (3) HORIZONTAL AND ONE (1) VERTICAL SLOPE, <br />C. FORTY-EIGHT (48) INCHES UNDER A ROADWAY MEASURED FROM THE SURFACE <br />OF SAID ROADWAY TO THE TOP OF THE INSTALLATION, <br />D. FORTY-EIGHT (48)INCHES UNDER A STORM WATER OR CREEK CHANNEL <br />DESIGN FLOW LINE, AND <br />E. MAINTAIN A MINIMUM OF 24" OF VERTICAL & HORIZONTAL SPACING FROM <br />EXISTING UTILITIES. <br />3. ALL POTHOLES IN SIDEWALK PANELS WILL REQUIRE FULL PANEL REPLACEMENT. <br />4. ANY CUT OR POTHOLE IN A CONCRETE STREETS PANEL WILL REQUIRE FULL <br />PANEL REPLACEMENT. <br />5. ANY CUT OR POTHOLE IN A ASPHALT STREET LANE WILL REQUIRE SEAM TO <br />SEAM ASPHALT MILLING AND REPLACEMENT. <br />Date: 09\23\2019 Checkedurawn: : I rvlSTSn <br />ADDroved: JPD <br />PROJECT: 23199 -STATE OF NEBRASKA <br />HEALTH 8 HUMAN SERVICE <br />208 N.PINE STREET <br />olssonA <br />PRIOR TO CONSTRUCTION: <br />CALL 811 FOR LOCATION OF <br />UNDERGROUND TELEPHONE, <br />ELECTRIC, GAS MAINS, CABLE <br />TELEVISION AND OTHER UTILITIES <br />EXISTING UNDERGROUND AND <br />OVERHEAD UTILITIES AND <br />DRAINAGE STRUCTURES HAVE <br />BEEN PLOTTED FROM <br />AVAILABLE INFORMATION AND <br />THEREFORE, THEIR LOCATIONS <br />MUST BE CONSIDERED <br />APPROXIMATE ONLY. IT IS THE <br />RESPONSIBILITY OF THE <br />INDIVIDUAL CONTRACTORS TO <br />EXACTLY LOCATE AND PROTECT <br />EACH EXISTING UTILITY BEFORE <br />AND DURING ACTUAL <br />CONSTRUCTION. <br />CONSTRUCTION SHALL MEET CITY <br />OF GRAND ISLAND STANDARD <br />CONSTRUCTION SPECIFICATIONS <br />AND STANDARD PLANS. <br />ef JOHN PAUL m <br />CL_ DIEDIKER <br />GENERAL NOTES <br />