Laserfiche WebLink
LEGEND OF SYMBOLS <br />EXISTING CONDUIT <br />EXISTING AERIAL FIBER <br />TRENCHED CONDUIT................................................................... <br />NEW AERIAL FIBER <br />NEW AERIAL FIBER, OVERLASH <br />MESSENGER CABLE <br />EXISTING CONDUIT <br />EXISTING SIGNAL CONDUIT <br />ROW <br />NEW PULL BOX <br />NEW PEDESTAL <br />NEW POLE <br />NEW DOWN GUY <br />NEW RISER <br />NEW SLACK SPAN <br />NEW SLACK LOOP <br />EXISTING PULL BOX <br />EXISTING PEDESTAL <br />EXISTING UTIUTY POLE <br />EXISTING SLACK LOOP <br />FXISIING SPLICE CASE <br />EXISTING MANHOLE <br />SIGN <br />BARRICADE <br />DRUM <br />BORE PIT <br />ARROW PANEL <br />CABLE AND CONDUIT DESIGNATIONS <br />cfl <br />CO <br />0 <br />CO <br />O <br />0 <br />G.e <br />0 <br />0 <br />1« <I <br />B is Conduit Bored )e..3' B) <br />C Is conductor (ie.. 3/C) <br />CC is Coaxial Cable <br />CCC is Camera Control Cable <br />COC Is Camera Detector Cable <br />CG is Circuit Ground <br />CPC IN Camera Power Cade <br />DB is Direct Buried <br />DMSC Is Dynamic Message Sign Cable <br />EDC is Emergency Detector Cable <br />ETW Is Electric Tracer Wire <br />EX is Existing <br />Fl is Fabric Interduct <br />FLC is Fiber Locate Cable <br />FTW is Fiber Tracer Wire <br />INS is Install <br />INT is Intraduct <br />LC is Lead -In Cable <br />M is Conduit Mounted (ie..2" M) <br />MB i5 Main Line Conduit Group Bored (6) 1 1/4" <br />MM Is Multi Mode Fiber Cable <br />MT is Main Lire Conduit Group Trenched (6) 1 1/4" <br />NO is Number <br />OH Is Over Head <br />PR is Pair of Communication (ie.. 6 PR) <br />REL Is ReIocate <br />REM is Reprove <br />RGS Is Rigid Galvanized Steel <br />SC is Service Cable <br />SL is Street Light <br />SM is Single Mode Fiber Cable <br />T is Conduit Trenched (1e..3" T) <br />TW is Tracer Wire (black or green) <br />SUMMARY OF QUANTITIES <br />)TEM <br />UNIT <br />QUANTITY <br />TRACER WIRE <br />LI <br />1,292 <br />FIBER, 144 Se, OVERHEAD <br />LF. <br />18 <br />FIBER. 144 SM, OVERHEAD SLACK STORAGE <br />LE. <br />100 <br />FIBER, 144 SM, UNDERGROUND <br />LF. <br />1,292 <br />FIBER 144 SM UNDERGROUND SLACK STORAGE <br />LF, <br />80 <br />PROJECT NOTES <br />1. THE LOCATIONS OF ALL AERIAL AND UNDERGROUND UTILITY <br />FACILITIES MAY NOT BE INDICATED ON THESE PLANS. UNDERGROUND <br />UTILITIES, WHETHER SHOWN OR NOT, WILL BE LOCATED AND FLAGGED <br />BY THE UTILITIES UPON THE REQUEST OF THE CONTRACTOR. NO <br />EXCAVATION WILL BE PERMITTED IN THE AREA OF THE UNDERGROUND <br />UTILITIES UNTIL ALL SUCH FACILITIES HAVE BEEN LOCATED AND <br />IDENTIFIED TO THE SATISFACTION OF ALL PARTIES, THE CONTRACTOR <br />SHALL BE RESPONSIBLE FOR PROTECTION OF ALL UNDERGROUND AND <br />AERIAL UTILITIES AND CONSTRUCTIONS. <br />2. UNLESS AGREED TO IN WRITING IN ADVANCE BY THE CITY, THE DEPTH OF <br />INSTALLED FACILITIES SHALL BE, AT A MINIMUM. AS FOLLOWS: <br />A FORTY-TWO (42) INCHES IN SOIL <br />B. FORTY-TWO (42) INCHES BELOW A PROJECTED SLOPE FROM THE FLOW UNE <br />OF A DITCH AT A THREE (3) HORIZONTAL AND ONE (1) VERTICAL SLOPE, <br />C. FORTY-EIGHT (48) INCHES UNDER A ROADWAY MEASURED FROM THE SURFACE <br />OF SAID ROADWAY TO THE TOP OF THE INSTALLATION, <br />D. FORTY-EIGHT (48) INCHES UNDER A STORM WATER OR CREEK CHANNEL <br />DESIGN FLOW LINE, AND <br />E. MAINTAIN A MINIMUM OF 24" OF VERTICAL & HORIZONTAL SPACING FROM <br />EXISTING UTILITIES. <br />3. ALL POTHOLES IN SIDEWALK PANELS WILL REQUIRE FULL PANEL REPLACEMENT. <br />4. ANY CUT OR POTHOLE IN A CONCRETE STREETS PANEL WILL REQUIRE FULL <br />PANEL REPLACEMENT. <br />5. ANY CUT OR POTHOLE IN A ASPHALT STREET LANE WILL REQUIRE SEAM TO <br />SEAM ASPHALT MILLING AND REPLACEMENT. <br />AERIAL FIBER INSTALLATION <br />1. INSTALL THE MESSENGER WITH CABLES TO SPECIFIED SAG AS SUBMITTED ON <br />COMM -SCOPE SAG DATA. <br />2. FIELD VERIFY ALL NEWLY INSTALLED CABLE/MESSENGER CLEARANCES ARE <br />CONSTRUCTED IN ACCORDANCE WITH THE NESC. <br />3. ALL ABANDONED BOLT HOLES ARE TO BF TREATED WITH WOOD PRESERVER <br />AND PLUGGED WITH SIMILAR MATERIALS AS STATED IN THE CONTRACT. <br />4. GROUNDING TO BE INSTALLED AS STATED IN THE CONTRACT. <br />PROJECT NO. <br />SHEET NO, <br />017-0078 <br />5.1 <br />Dale: 3,03,019 <br />01.11, TMP <br />Checked STs <br />Approved: JPD <br />PROJECT: 20304-V2W DISTRICT 30 <br />GRAN CONNECTOR <br />0155011 <br />Unite <br />PRIOR TO CONSTRUCTION: <br />CALL B11 FOR LOCATION OF <br />UNDERGROUND TELEPHONE, <br />ELECTRIC, GAS MAINS, CABLE <br />TELEVISION AND OTHER UTILITIES. <br />EXISTING UNDERGROUND AND <br />OVERHEAD UTILITIES AND <br />DRAINAGE STRUCTURES HAVE <br />BEEN PLOTTED FROM <br />AVAILABLE INFORMATION AND <br />THEREFORE, THEIR LOCATIONS <br />MUST BE CONSIDERED <br />APPROXIMATE ONLY, IT IS THE <br />RESPONSIBILITY OF THE <br />INDIVIDUAL CONTRACTORS TO <br />EXACTLY LOCATE AND PROTECT <br />EACH EXISTING UTILITY BEFORE <br />AND DURING ACTUAL <br />CONSTRUCTION. <br />CONSTRUCTION SHALL MEET CITY <br />OF GRAND ISLAND STANDARD <br />CONSTRUCTION SPECIFICATIONS <br />AND STANDARD PLANS. <br />GENERAL NOTES <br />