My WebLink
|
Help
|
About
|
Sign Out
Browse
201902143
LFImages
>
Deeds
>
Deeds By Year
>
2019
>
201902143
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2019 3:28:41 PM
Creation date
4/16/2019 3:25:20 PM
Metadata
Fields
Template:
DEEDS
Inst Number
201902143
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT NOTES <br />(a) "All work shall be performed in accordance with the Design and Construction Standards of the City and shall be <br />completed to the satisfaction of the City Engineer. In the event that a design element does not reflect City specifications, <br />the matter must immediately be brought to the attention of the design engineer and the City Engineer. The design engineer <br />shall be responsible for recommending a solution or alternative solutions to the City for review and approval." <br />(b) "The approval of an engineering construction drawing does not relieve the owner -developer -contractor of the responsibility of <br />constructing workable public improvements. All revisions and/or corrections required will be solely the owner's -developers - <br />contractor's responsibility. and at their expense." <br />(c) "These plans have been checked by the City only for conformance with the Design and Construction Standards, <br />compliance with development agreement conditions and for general conceptual approval of public improvements as shown. <br />No detailed mathematical check was made for the accuracy of existing or proposed dimensions, lines or grades shown, <br />including all existing utilities shown or not shown." <br />(d) "Utility locations shown reflect available record data. The contractor shall take precautionary measures to protect all utility <br />lines shown and other utility lines otherwise located. The contractor shall notify the City Utilities Division and private utility <br />companies 24 hours prior to beginning construction." <br />(e) Before work begins, the contractor shall obtain a permit to work in the right-of-way from City Engineering Support Services <br />and must notify the City right-of-way inspection staff 24 hours in advance of commencing construction activities." <br />(f) The owner -developer shall provide the contractor with a complete and updated set of engineering construction drawings. <br />These drawings, and any required permits, shall be at the site at at times and shall be make available to City staff upon <br />request. If no plans appear on the project site; construction activities may be halted at the discretion of the City Engineer, <br />or a designated representative." <br />'The contractor agrees to comply with the provisions of the ATSSA Guide for Work Area Traffic Control and the Manual of <br />Uniform Traffic Control Devices for construction signage-" <br />(H) "All surplus materials, tools, and the temporary structures, furnished by the contractor, shall be removed from the project <br />site by the contractor. All debris and rubbish caused by the operations of the contractor shall be removed, and the area <br />occupied during construction activities shall be restored to its original condition, within 72 hours of project completion, unless <br />otherwise directed by the City Engineer." <br />TELECOMMUNICATION FACILITY STANDARDS <br />(9) <br />The following standards shall apply to all telecommunication related facilities <br />constructed within the City's Right -of -Way including local telephone, long distance <br />telephone, cable TV, and other telecommunication services franchised or otherwise <br />permitted By the City of Kearney. All telecommunications facilities constructed in <br />the City's Right -of -Way shall be underground unless otherwise permitted by the <br />City Engineer. <br />General <br />(a) All telecommunications facilities construction shall conform to the reqirements <br />of the following standards: <br />(1) American National Standards Institute, Inc. (ANSI), Electronic <br />Industries Association (EIA), and Telecommunications Institute of America (TIA) <br />Standards: EIA/TIA Standards Proposal No. 2840-A, Proposed Revision of EIA/TIA-568 <br />(if approved to be published as EIA/TIA-568-A), EIA/TIA-569 Commercial Building <br />Standard for Telecommunications Pathways and Spaces, and TIA/EIA-607 Commercial <br />Building Grounding and Bonding Requirements for Telecommunications. <br />(2) 1993 National Electrical Safety Code (NESC) C2-1993, published by the <br />Institute of Electrical and Electronics Engineers (IEEE), Inc. <br />(3) National Electrical Code (NEC), published by the National Fire Association <br />(NFPA). <br />(4) Federal Communications Commission <br />(5) Nebraska Public Utilities Commission <br />(6) Williams -Steiger Occupational Safety and Health Act (OSHA) <br />(b) Detailed 1 inch = 30 feet scale engineering drawings presenting the specific <br />conduit routing and associated manhole locations and specifications, shall be <br />submited to the City Engineer's office for review and approval. <br />Underground Cable Protection <br />(a) All buried telecommunications cable, shall be installed in conduit, SDR -11 <br />or equivalent. Cable placement by means of direct plow -in will not be allowed <br />within the City's Right -of -Way, <br />Depth of Cover <br />(a) The minimum depth of cover over the conduit shall be 48 inches <br />Trench Specifications - Roadway and Other Paved Surfaces <br />(a) All trenches shall be open cut unless otherwise permitted by the City <br />(b) Trenches shall have a minimum width of 6 inches. <br />(c) Trench backfill shall be flowable fill specified as a 0.6 sack mix. <br />Trench Specifications - Landscaped Areas <br />(a) All trenches shall be open cut unless otherwise permitted by the City <br />(b) Trenches shall have a minimum width of 6 inches. <br />(c) Trenches shall be backfilled and compacted to at least 95 percent of maximum <br />density at optimum moisture content as determined by ASTM D698. <br />(d) The City Forester shall be contacted to determine if the proposed work will cause <br />any damage to trees, shrubs or other landscaping. <br />Joint Use Trench Requirements <br />(a) Joint trenching operations require advanced planning and coordination with the <br />utilities involved. <br />(b) The above trench specifications shall also apply to joint use trenches <br />LEGEND <br />v STREET SIGN <br />LL FIRE HYDRANT <br />WATER METER <br />UTILITY VALVE <br />® UTILITY POLE <br />Q UTILITY MANHOLE <br />91 ELECTRICAL NH - TRAFFIC HH <br />CD TELEPHONE PED - CROSS Dox <br />im PROPOSED NAERO MANHOLE <br />o PROPOSED NAERO HANDHOLE <br />Q TREE <br />STORM INLET <br />LINETYPES <br />_- --.— COCIT-IWTM WIRCI <br />-- ---- <br />CONDUIT -ORM /nwI <br />GMAI- -- � <br />RIM <br />- ECIIW,LL BORE A— RIM -Cr --BAY <br />Lc, EDGER ASPHALT <br />GAS-0RSTRR <br />UIOEPINUM EEGM-EBSIM <br />- - TEMOE-DISTNa <br />STORM SEVER-00SM <br />........ SAMMY SLTEA-MNG <br />---_;.� SIM-ERSTNG <br />• aAme-rzsrxc <br />CO <br />CLICS <br />0.11.9 It 4.04G <br />VIAERO' <br />Fiber Networks, LLC <br />ma a RYb Aga RtI-R0-41-3142 <br />fol Iota m <br />WO waMaml <br />Ba MOS <br />GRAND ISLAND NEBRASKA <br />CITY OF GRAND ISLAND <br />PROJECT NOTES <br />RL MIL V_Eil_EAST-CITV,O, <br />MB OBE 121201g <br />,IZE 11. 16 <br />CLTZO6JO <br />
The URL can be used to link to this page
Your browser does not support the video tag.