Laserfiche WebLink
Street Name <br />Curb sidewalk <br />Conventional Sidewalk <br />Sidewalk Requirement <br />Waived by Council <br />Buffalo Grass Street <br />x <br />NO <br />Buffalo Grass Circle <br />x <br />NO <br />NO <br />3. Sanitary Sewer. Public sanitary sewer is available to the subdivision and the <br />Subdivider agrees to extend, connect and provide sanitary sewer service to all lots in the subdivision <br />in accordance with plans and specifications approved by the Director of Public Works, and subject to <br />the City's inspection. <br />4. Storm Drainage. The Subdivider agrees to grade all lots in the subdivision in <br />conjunction with the development proposed thereon so that storm drainage is conveyed to a public <br />right -of -way or to other drainage systems so approved by the Director of Public Works. If the <br />Subdivider fails to grade and maintain such drainage the City may create a drainage district to <br />perform such work. The Subdivider agrees to waive the right to object to the creation of any drainage <br />district benefitting the subdivision. <br />5. Sidewalks. The Subdivider shall install and maintain all public sidewalks <br />required by the City of Grand Island when the lots are built upon, and such sidewalk shall be <br />regulated and required with the building permit for each such lot. <br />The Subdivider must select curb or conventional sidewalk for each street unless the <br />requirement has been waived by Council. <br />201804454 <br />