Laserfiche WebLink
749482004 RL GRISNE 3650 GDISNE FORCED EXIT 3650 W 13TH ST <br />50 West 13th Street <br />Grand Island <br />201804404 <br />Install approximately 350' of new OSP fiber facilities so that a bypass cable can be placed to splice <br />around GDISNEBV, 3650 W. 13th St, Grand Island, NE for a forced exit. <br />Verizon is vacating the site. Windstream has no need for the site and significant cost savings can be <br />realized by decommissioning the site. Windstream Network Optimization (Rodney Heil & Craig <br />Lillemoen) has recognized this as a valid forced exit and cost savings initiative. <br />Bore one duct at back of ROW in line with existing MHs. <br />Pull 72ct Fiber between the 2 MH leaving 50' tails for splicing. <br />Splice both ends of the new fiber into the existing 72ct fiber on either end. <br />Page 1 of 2 <br />EXHIBIT "A" 2018/7/3 <br />