Laserfiche WebLink
Conclusion. <br />I certify that the analysis and calculations provided in this study accurately determine the <br />proper method that should be used for placing of both the 11 pilipg and ttie sheet piling for <br />this bridge. <br />This concludes my review and certification on the analysis and calculations for the attached <br />vibration mitigation study for the proposed pedestrian bridge installation at the JBS Swift <br />plant in Grand Island, Nebraska. If you have any questions or need further clarification to <br />this study and my review, please feel free to contact me at 308 - 236 -2166. <br />Sincerely, <br />Paul Brungardt <br />Brungardt Engineering, LLC <br />201800874 <br />