Laserfiche WebLink
auction. <br />standing. <br />(ff) <br />good standing. <br />(gg) <br />Mall. <br />(ee) Any use similar to that of a current tenant of the Mall that is in good <br />Any use that may compete with a current tenant of the Mall that is in <br />Any use that violates an exclusive provision of a current tenant of the <br />11 <br />201706687 <br />Notwithstanding anything to the contrary herein, any current tenant of the Mall in good <br />standing can continue any and all uses permitted under their Lease and any extension thereof. <br />ARTICLE V <br />PERMITTING, GENERAL CONSTRUCTION & DEVELOPMENT <br />Section 5.1 Preliminary Approvals. No buildings or structures shall be erected or <br />allowed to remain on any portion of any Parcel not owned by the Declarant unless the plans <br />and specifications for such structure have been approved by the Declarant, which approval shall <br />not be unreasonably withheld. A complete set of proposed construction plans including a site, <br />foundation, floor plan and elevation drawings of all sides shall be presented to and approved in <br />writing by the Declarant prior to commencing construction of a building of any kind on an <br />Outparcel, which approval shall not be unreasonably withheld, conditioned or delayed. Declarant <br />shall grant or withhold its approval within thirty (30) days after delivery of written request therefor. <br />If Declarant fails to respond within such thirty (30) day period, the party requesting approval shall <br />have the right to send a second request for approval, indicating in bold, capital type at the top of <br />the request, that approval will be deemed granted if not withheld in writing within ten (10) days <br />after delivery, and if Declarant fails to respond to such second notice within ten (10) days after <br />delivery thereof, Declarant's approval shall be deemed granted. Upon completion of the <br />Building foundation, an actual field survey of the foundation shall be presented to the Declarant to <br />ensure that it has been constructed in accordance with the Site Plan. All improvements shall comply <br />with the plans as presented to the Declarant unless changes are approved in writing by the <br />Declarant. The right to make inspections necessary to assure compliance is reserved to the <br />Declarant. Weather permitting, all paving and landscaping will be finished upon completion of <br />the Building, but in no event shall it be installed later than ninety (90) days after the Building is <br />