My WebLink
|
Help
|
About
|
Sign Out
Browse
200104874
LFImages
>
Deeds
>
Deeds By Year
>
2001
>
200104874
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2011 4:39:19 AM
Creation date
10/20/2005 8:49:26 PM
Metadata
Fields
Template:
DEEDS
Inst Number
200104874
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
200104874 <br />ORDINANCE NO. 8671 (Cont.) <br />prolongation of the west right -of -way line of Main Street; thence south to the <br />intersection of the south right -of -way line of Seedling Mile Road and the west <br />right -of -way line of Main Street; thence west One Hundred Eighty Four and Eight <br />Tenths (184.8) feet along the south right -of -way line of Seedling Mile Road; <br />thence south eight hundred twenty -five (825.0) feet to the north right -of -way line <br />of Gregory Avenue, being the southwest corner of Dahlke Subdivision; thence <br />west along said right -of -way line to the west line of Sass Subdivision; thence <br />southwest to the northeast corner of Lot Eleven (11) of the Subdivision of Lot <br />Nine (9), Windolph's Subdivision; thence west along the north line of said Lot <br />Eleven (11), to the northwest corner of said Lot Eleven (11); thence south along <br />the west lot line of said Lot Eleven (11) to the prolongation of the south lot line of <br />Lot Ten (10), Villa Mar Dee Subdivision; thence west along the south lot line of <br />Lot Ten (10) and Lot Twenty (20) of Villa Mar Dee Subdivision and the <br />prolongation thereof to a point on the north line of Gregory Avenue at the <br />prolongation of the west line of Lot Two (2), Industrial Addition; thence south to <br />the southwest corner of said Lot Two (2); thence east along the south line of Lot <br />One (1) and Lot Two (2) Industrial Addition to the southeast corner of said Lot <br />One (1); thence south on the east line of Industrial Addition to a point Two <br />Hundred Ninety Five and Seventeen Hundredths (295.17) feet south of the <br />southwest corner of Sass Second Subdivision; thence east on a line Two Hundred <br />Ninety Five and Seventeen Hundredths (295.17) feet south of and parallel to the <br />south line of Sass Second Subdivision to the west right -of -way line of Shady <br />Bend Road; thence north on the west right -of -way line of Shady Bend Road to the <br />point of beginning, all as shown on the plat dated May 7, 2001, attached hereto as <br />Exhibit "A" and incorporated herein by reference. <br />SECTION 3. Said improvement shall be made in accordance with plans and <br />specifications prepared by the Engineer for the City who shall estimate the cost thereof, and <br />submit the same to the City Council, and thereafter, bids for the construction of such sanitary <br />sewer shall be taken and contracts entered into in the manner provided by law. <br />SECTION 4. The cost of construction of such sanitary sewer district shall be <br />assessed against the property within the district abutting upon the easement or other right -of -way <br />within which such sanitary sewer main has been constructed, to the extent of benefits to such <br />property by reason of such improvement, and a special tax shall be levied at one time to pay for <br />such cost of construction as soon as can be ascertained as provided by law; and such special tax <br />Approved as to Form <br />- 2 - May 22, 2001 ♦ <br />CRY ttorney <br />
The URL can be used to link to this page
Your browser does not support the video tag.