Laserfiche WebLink
- 2 - <br />201701402 <br />THIRTY SEVEN AND SIXTY THREE HUNDREDTH (937.63) SQUARE FEET OR TWO TENTHS <br />(0.02) ACRES MORE OF LESS. <br />together with the following rights, namely, unrestricted ingress and egress under, over, and across such <br />land for the purpose of exercising the rights herein granted, to excavate and refill ditches and trenches, <br />and the right to clear and keep clear of trees, roots, brush, hedges, undergrowth, and other obstructions <br />from the surface of such tracts interfering with the location, construction, inspection, repair, replacement, <br />removal, and maintenance of such utilities. Any such utilities and appurtenances placed upon, over, and <br />under such tracts of land shall remain the property of the Grantee and may be removed or replaced at any <br />time. <br />The Grantors, for themselves, their heirs, executors, administrators, successors, and assigns, <br />hereby covenant that no buildings, fences, or structures shall be erected or permitted on said tract and that <br />the easement herein granted shall run with the title to such tract of land and be binding upon the Grantors, <br />their successors and assigns. <br />The Grantee agrees to do the following: <br />• Re -sod all disturbed areas and return to pre- construction conditions. <br />• Pre - construction slope and grade conditions will be re- established following construction <br />through this segment of the project. <br />• Mature linden tree is on the property just outside of the temporary easement. Special <br />provisions of the construction project will provide protection of the tree during construction <br />activities. <br />o Slopes around the tree will also be maintained during and following construction <br />• Any sprinklers damaged during the course of construction will be repaired as soon as possible <br />so as to minimize downtime to the system. Sprinkler repair will be at the contractor's expense. <br />• At this time it is anticipated construction for this easement segment will take place during any <br />three (3) week period in April, May, or June of 2017. <br />• Construction involves the installation of 8 -inch diameter gravity sanitary sewer and an <br />associated manhole. Temporary easements in similar situations have been utilized for stock- <br />piling of dirt. <br />