Laserfiche WebLink
200100229 <br />3. Sanitary Sewer. Public sanitary sewer main is not available to the <br />subdivision; therefore individual systems shall be permissible on an initial basis. However, the <br />Subdivider waives the right to protest the creation of a sanitary sewer district within or abutting the <br />subdivision. Lot One (1) must be connected to such sewer district within two years of district <br />completion. <br />4. Storm Drainage. The Subdividers agree to grade all lots in the subdivision <br />in conjunction with the development proposed thereon so that storm drainage is conveyed to a public <br />right -of -way or to other drainage systems so approved by the Director of Public Works. <br />5. Sidewalks. Immediate sidewalk construction adjacent to Airport Road shall <br />be waived. However, the sidewalks shall be constructed when the property owner is directed to do <br />so by the City Council. In the event a Street Improvement District is created to pave any public street <br />in the subdivision, the Subdividers agree to install public sidewalks within one year of the <br />completion of such street improvement district in accordance with the City of Grand Island Sidewalk <br />Policy. <br />6. Flood Plain. Since the subdivision is within a delineated flood plain, all <br />structures constructed shall have the lowest floor elevation to a minimum of one foot above the <br />elevation of the 100 -year flood as determined by the building permit received by the Subdivider or <br />successors from the Building Department under the provisions of Section 2- 1506.06, R.R.S. 1943. <br />No basement shall be constructed in connection with any structure in the flood plain unless such <br />basement is floodproofed and certified as such by a qualified engineer or architect. <br />-3- <br />