Laserfiche WebLink
� 200000039 <br /> I. Other buildings and uses accessory to any of the aforesaid pernutted uses. <br /> J. Construction, operation, maintenance and reconstruction of an interstate roadway. <br /> including, but not limited to, a lighted interchange and four lane divided roadway. <br /> IV. EASEMENT ADMINISTRATION <br /> A. This easement shall be managed and administered by Holder. <br /> B. The Holder may enforce all the terms and conditions of this easement, along with all <br /> rights and power reserved in this easement, through such general or specific <br /> regulations or orders as have been, or may from time to time be, promulgated under <br /> its general governmental authority. <br /> C. Grantor shall pay all regular and special real estate taxes levied upon the subject land. <br /> V. GENERAL PROVISIONS <br /> A. The agreed upon purpose of this easement is the protection of these lands from <br /> commercial and industrial development, including but not limited to access roads, <br /> commercial or industrial development across the land, mining or extraction of sand, <br /> gravel or other minerals, and the use of lighted signs annually during the period of <br /> February 1 through May 31. This agreement is not meant to affect the installation, <br /> operation and maintenance of lighted informational, regulatory or traffic control signs <br /> located within the right-of-way of Interstate 80. Any ambiguities in this easement <br /> shall be construed in a manner which best effectuates preservation and protection of <br /> the existing crane and other wildlife habitat. <br /> B. Any subsequent amendment or repeal of any federal or state law, order, or regulation <br /> shall not affect the rights reserved by Holder, its successors and assigns. <br /> C. Holder, its successors and assigns, shall have the right to make studies or surveys, <br /> take photographs, prepare such documentation, and undertake such monitoring in the <br /> future as may be necessary or desirable to administer the provisions of this easement. <br /> Any such map, plat, or other suitable document may be recorded in the land records <br /> of the respective county in which the property is located. Any entry upon Interstate <br /> 80 right-of-way must be approved by the Nebraska Department of Roads. <br /> D. The easement reservation alone does not authorize public entry upon or use of these <br /> lands. <br /> E. Grantor and invitees may hunt, fish, and trap on these lands in accordance with <br /> applicable federal, state, and local game and fish regulations. <br /> F. It is understood and agreed that this grant of perpetual conservation easement imposes <br /> no other obligations or restrictions upon Grantor and that neither Grantor, nor <br /> Grantor's successors and assigns, nor any other person or party claiming under them, <br /> shall be restricted in any manner from utilizing the subject land in the customary <br /> manner for agricultural purposes or for public highway purposes except as herein <br /> provided. <br /> Page 3 of 5 <br /> � <br />