Laserfiche WebLink
201404083 <br />right -of -way line of Husker Highway, said point being the ACTUAL Point of <br />Beginning; thence S31 °17'22 "W, a distance of seven hundred forty five and <br />forty five hundredths (745.45) feet to a point on the northerly line of Lot One (1), <br />Dixson Subdivision, Hall County, Nebraska. The side lines of the above <br />described tract shall be prolonged or shortened as required to terminate on the <br />boundary of Grantor's property. <br />The above - described easement and right -of -way containing 0.34 acres, more or less, as <br />shown on the plat dated 6/3/2014, marked Exhibit "A" attached hereto and incorporated <br />herein by reference. <br />Together with the following rights: <br />Grantee shall have unrestricted ingress and egress to the above - described <br />easement and right -of -way for any purpose necessary for the surveying, construction, <br />inspection, maintenance, repair, replacement, relocation, extension, removal, and <br />operation of such public utilities and appurtenances. Such rights of ingress and egress <br />shall be exercised in a reasonable manner. <br />Grantee shall have the right to excavate and refill ditches and trenches <br />necessary for such public utilities and appurtenances; to remove, clear, and keep clear, <br />trees, bushes, hedges, undergrowth, and /or any other obstructions interfering with the <br />surveying, construction, inspection, maintenance, repair, replacement, relocation, <br />extension, removal, and operation of such public utilities and appurtenances. <br />Grantee shall have the right at any time, to relocate, add, or upgrade such public <br />utilities and appurtenances connected therewith, in, upon, above, along, over, across, <br />underneath, or through the easement and right -of -way herein granted. Any such public <br />utilities and appurtenances placed in, upon, above, along, over, across, underneath, or <br />through such tract of land shall remain the property of Grantee, and may be removed or <br />replaced at any time. <br />Grantor shall have the right to use the easement and right -of -way for purposes <br />not inconsistent with Grantee's full enjoyment of the rights herein granted, provided that <br />Grantor shall not allow any combustible materials or permanent structures to be, placed, <br />[2] <br />