Laserfiche WebLink
1vIISCELI�AN�OUS �.ECORD � <br /> l�� <br /> 29058-TN[Atl00{TINfiCO.YR�NDIfL11ND,N!!R, h �� . � . ., � <br /> The Licensee shall keep and maintain the soil over the Pipe Line thoroughly compacted <br /> and the g�ade even with the ad,�acent surface of the ground. 2. <br /> Section 3. NOTICE OF COM24ENC�MENT OF WORK. <br /> The Lieensee shall notify the �a.ilroad Company at least Porty-eight houra in advance <br /> of the commencement of any work an said ri�ht of way in connection with the construetion, <br /> mainten n <br /> a ee, repair, renewal, modification, reconstruction, relocation or removal oP the <br /> Pipe Line. <br /> Section 4. MODIFICATION OR RELOCATION OF PIPE LINE. <br /> The Licensee shall, at th2 sole ex�ense of the Licensee, make any and all modifications or <br /> changes in the Pipe Line or move all or any part thereof to such ne�r location as may be <br /> required by the Railroad Company, at any ti�he, iM connection with the construction, maintenance, <br /> repair, renewal, use, operation, cl�ange, modification or relocat�:on oP r�,i:iroad traeks, <br /> telegraph, telephone, signal or other pole axid wire lines, pipe lines and other facilities <br /> oP the Railroad Company upon said right of way. <br /> All the terms,' conditions and stipulations herein exvressed with reference to the Pipe <br /> line on said right of way in the location hereinbePore described sha.11 apply to the Pipe Line <br /> as modified, cY�anged or relocated within the contemplation of this section. <br /> Seetion 5. NO INTERFERENCE WIZH RAILROAD OPERATIONS. <br /> The Pipe L3,ne shall be constructed, maintained, repaired, renewed, operated, used, <br /> modified, reconstructed, relocated and/or removed in such manner as to cause no interference <br /> whatsoever with the eonstant, continuous and uninterrupted use of the tracks and other property <br /> oP the Railroad Company, and nothing shall be done or suffered to be done by the Licensee <br /> that would, in any manner, impair the safety of said tracks or other property. <br /> 3ection 6. RESTORATION OF RAILROAD COMPANY' S PROPERTY. <br /> In the et�ent the Licensee shall take down any fence of the Railroad Company or, in any <br /> � manner, move or disturb any other property of the Railroad Company in connection with the <br /> construction, main�enance, repair, renewal, modification, reconstruction, relocation or <br /> removal of the Pipe Line, the�, �nd in that event, the Licensee shall, as soan as possible <br /> and at the sole expense of the Licensee, res�ore such fence and/or such other property to <br /> the same condition as it was in before such Pence wa.s taken dawn or such other property was <br /> moved or disturbed, and tMe Licensee shall indemnify and save harmless the Ra.ilro�,d Company <br /> from and against any and all Iiability, loss, dam�.ges, claims, demands, costs and ex�enses <br /> oP wha,tsoever nature, inclucling ccurt costs and attorneys! fees, which may resuit Prom in�ury <br /> to or death of persons whomsoever, or damage to or loss or destruction of property wha.tsoever, <br /> when such in�jury, death, damage, loss or destruction grows out of or arises Prom the taking <br /> down of any fence or the moving or disturbing of any other property of the Railroad Company. 3. <br /> Section 7. DISPOSAL OF PROPERTY. <br /> In the event the Railroad Company shall dispose oY any oP its property upon which the <br /> Pipe Line is located, as herein provided, the license or permit herein granted, with respect <br /> �o the portion of the Pipe Line located upon the pro�erty so disposed of, shall forthwith <br /> ceaae and determine. <br /> Section �. LIABILITY. <br /> The Licensee shall indemniPy and hold harmless the Ra.11road Company from and against any <br /> and all li�.bility, loss, damage, claims, demands, costs and ex�enses oP whatsoever nature, <br /> including court costs and attorneys ' fees, tahich may result from in�ury to or death of <br /> persons whomsoe�er, or damage to or loas or destruction of property whatsoever (including <br /> damage to the roadbed, tracks, ea,uipment or other property of the Ra.ilroad Company or <br /> property in its care or custody) , when such in�ury, death, loss, destruction or damage grows <br /> out of or arises �rom the bursting oP or leaks in the Pipe Line, or in any other way wha,tsoever <br /> ia due to, or arisea '�ecause of, the existence of the Pipe Line or the construction, operation, <br /> ma�ntenance, repair, renewal, modification, reconstruction, relocation or removal of the Pipe <br /> Line or any p�rt thereof, or to the contents tY�Erein or therefrom. And the Licensee does <br /> hereby release the Ra.ilroad Com�any from all liability for damages on account oP in�ury to the <br /> Pipe Line from any cause whateoever. <br /> Section 9. TERMINATI�N ON ABANDONMENT OR DEFAULT. <br /> Disuse oP the Pipe Line continuing, at any ti�e, for �. period of one year shall constitute an <br /> abandonment thereoP, and, ir} the event of such an abandonment, the Railroad Company may, at ita <br /> option, terminate this agreement. <br /> IP the Licensee shall fail to keep and perform all or any of the covenants and agreements <br /> herein contained to be by it kept and performed, and such default shall continue for a period of <br /> thirty days after written notice from the Ra.ilroad Company to the Licensee specifying such de- <br /> fault, then the Railroad Company m�y, at its option, forth�aith terminate this agreement. <br /> Section 10. REM�VAL OF PIPE LINE UPON TERMINATION OF AGREEMENT. <br /> Within ninety days after the termination of this agreement howsoever, the Licensee � <br /> shall, at the sole expense of the Licensee, remove the Pipe Line from said right of way <br /> and restore, to the satiafaction of the Railroad Company, said right of way and the roadbed <br /> of said track or traeks to aa good condition as they were in a,t the ti�e of the construction <br /> oP the Pipe Line; and if the Licensee fails so to do, the Aailroad Company may do such work of <br /> removal and restoration at the expense of the Lieensee. In the svent of the removal of the <br /> Pipe Line as in this section provided, the Railroad Company shall, in no manner, be liable to <br /> the Licensee for any damage sustained by the Licensee for or on account of such removal, and � <br /> such removal shall, in no manner, pre�udiGe or impair any right of action f'or damage, or other- <br /> wise, that the R�ilroad Company may have against the Licensee. �. <br /> Nothing in this section conta�.ned shall obligate the Licensee to remove the Pipe Line. <br /> because of termination of this license with res�ect to same under the nrovisiona of Section 7 <br /> hereof in cases �ahere the Licensee shall have made arran�ements Por the continuation oP the <br /> Pipe Line with the grantee or grantees of the Railroad Company. <br /> Section 11. WAIVER OF BREACH. <br /> The waiver by the Railroad Company of the breach of any condition, covenant or <br /> agreement herein contained to be kex�t, observed and performed by the Licensee shall 3n no <br /> way impair the right of the Railroad Company to avail itself of any subsequent breach thereof. <br /> 3ection 12. AGREEMENT NOT T0. BE ASSIGNED. <br /> The Licensee shall not assign this agreement without the written conaent of the Ra.ilroad <br /> Company. <br /> , � <br />