Laserfiche WebLink
daviscesgn <br /> CHANGE ORDER <br /> (CO) <br /> PROJECT: Hall County CHANGE ORDER NUMBER: 9 <br /> Courthouse Addition and Renovation <br /> 111 W. 1st St. CONTRACT FOR: Prime <br /> Grand Island,NE <br /> CONTRACT DATE: 8/20/2024 <br /> DAVIS DESIGN PROJECT NO.: 23-0053 <br /> TO: Chief Construction <br /> (Contractor) 3935 Westgate Rd. OWNER: Hall County <br /> Grand Island,NE 68803 200 S. Sycamore Street <br /> Grand Island,NE 68801 <br /> The Contract is changed as follows: <br /> CCP No. 23: See attached copy. ADD $CCP No. 24: See attached copy. ADD $CCP No. 25: See attached copy ADD $ <br /> CCP No. 26: See attached copy CREDIT $ <br /> NOT VALID UN77L SIGNED BY THE OWNER,ARCHITECT,AND CONTRACTOR <br /> The original Guaranteed Maximum Price was $35,816,566.00 <br /> Net change by previously authorized Change Orders 0.00 <br /> The Guaranteed Maximum Price prior to this Change Order was 35,816,566.00 <br /> The Guaranteed Maximum Price will be increased <br /> by this Change Order in the amount of 0.00 <br /> The new Guaranteed Maximum Price including this Change Order will be $35,816,566.00 <br /> The Contract Time will be increased by (0) days. <br /> The date of Substantial Completion as of the date of this Change Order therefore is February 1, 2028 <br /> Note: This summary does not reflect changes in the Contract Sum,Contract Time or Guaranteed Maximum Price <br /> which have been authorized by Construction Change Directive. <br /> 1��., — j72�J4(74 4-17-26 <br /> By: <br /> Davis Design,Inc. Date <br /> DlgYally signed by Huse,Kyle <br /> Huse, K le ON CN e.�r'ou w <br /> _23 ON,ou=users,ou=coosctior. <br /> By: Dole:2020 Ae 17 13 07 48-05'00' 4/1 7/26 <br /> Chief Co ruction ::v' / <br /> By: <br /> architecture engineering interior design <br />