My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/16/2021
LFImages
>
County Clerk
>
Board Minutes & Agendas
>
Board of Commissioners
>
Agendas & Minutes
>
Prior Years
>
2021
>
02/16/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2022 9:58:02 AM
Creation date
2/25/2021 8:57:03 AM
Metadata
Fields
Template:
Marriage License
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOW THEREFORE BE IT RESOLVED that Hall County's F.Y. 2020-2021 One & Six year Road <br /> Program is hereby amended by adding project number C40(476); and <br /> Resolution moved by Commissioner Scott Sorensen <br /> Seconded by Commissioner Gary Quandt <br /> Vote: <br /> Karen Bredthauer For 1 ; Against_; Abstained_; Not Present_ <br /> Butch Hurst For 1(; Against_; Abstained_; Not Present_ <br /> Pamela Lancaster For mac; Against_; Abstained_; Not Present_. <br /> Ron Peterson For_; Against_; Abstained_; Not Present— <br /> Gary Quandt For_; Against_; Abstained_; Not Present_ <br /> Jane Richardson For.; Against_; Abstained_; Not Present_. <br /> Scott Sorensen For L; Against_; Abstained_; Not Present_ <br /> PASSED AND ADOPTED THIS 16th DAY OF FEBRUARY, 2021. <br /> NTY BOARD OF OMMISSIONERS <br /> 40101"_'/..e• __ dtLd i i i <br /> 'amela Lancaster ai ••erson <br /> Hall County Board of Commissioners <br /> 1��� <br /> Marla J. onley-Hall ' ounty Clerk <br /> D) PUBLIC WORK UPDATE–Steve stated they are working on the shop floor removing the <br /> concrete and finishing the rebar. The concrete will be 8 inches thick with #4 rebar. The old floor <br /> was 4 to 6 inches thick with a mesh fabric. The new floor will also have a drainage system that <br /> will help. <br /> He stated that the repairs for the rubber tire excavator were received and they started on it <br /> yesterday. With the extreme cold they have been having some equipment problems. They <br /> have been careful to make sure they have vehicles and can keep warm. He stated they will be <br /> having some manager training on February 18, 2021. <br /> Steve reported that they have used a lot of salt and still had to do snow removal last weekend <br /> with the snow plows. They are using they motor graders to widen the roads. The snow fences <br /> are full and so are the ditches. <br /> Quandt as if they had received the motors and Steve stated they have not they ae still waiting. <br /> 7. JUVENILE DIVERSION RANDY SEE RECEIVE THE ASSESSMENT SUMMARY (J.J.I. N-O <br /> 2020) – Randy See Juvenile Services Director stated that now the Crime Commission requires <br /> a 5 year juvenile review before they can receive he community based aid grant. They are doing <br /> a 5 year assessment to standardize information from the counties. The summary is looking at <br /> issues for the juvenile service system state wide and based on this assessment what they need <br /> to put in this grant. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.