Laserfiche WebLink
HALL COUNTY Change Order No: 002 <br /> Contract Change Order I Date: 11113/2018 <br /> County Project Number: 2018 Hall County Administrattion Building Parking Lot Replacement <br /> Change Order Description: Rework the Existing driveway on Sycamore Street to serve only as an entrance to the <br /> Early Voting Drop Off Box <br /> Contractor: Bigzby's, Inc. <br /> Letting Date: August 21,2018 <br /> Contract Award Date: August 21,2018 <br /> Contract Amount before Change Order $255,140.98 <br /> Current Revised Change <br /> Item Unit of Contract Contract Bid Order Amount of Change <br /> # Item Description _ Measure Quantity Change _Quantity Price Price <br /> 17 Install 6"Concrete Pavement Square 3,687 35 3,722 $ 36.54 N.A. $ 1,278.90 <br /> Yards <br /> 18 Install 6"Colored Stamped Concrete Square 198 48 246 $15.00 N.A. $ 720.00 <br /> Feet <br /> 7 Remove Pavement Square 4,118 -29 4,089 $5.00 N.A. $ (145.00) <br /> Yard <br /> 10 Remove Curb and Gutter Linear 94 -32 62 $5.00 N.A. $ (160.00) <br /> Foot <br /> 20 Construct Curb and Gutter Lineal 66 -32 34 $ 25.00 N.A. $ (800.00) <br /> Foor <br /> Total for Change Order: I $ 893.90 <br /> Revised Contract Amount after Change Order: $ <br /> I 256,034.88 <br /> Change Order Narrative <br /> The project plans were prepared to eliminate the driveway to Sycamore at the northeast corner of the parking lot near <br /> the Building and Grounds office.The driveway is currently being used to serve the Early Voting Drop Off box. The <br /> driveway and current drop box location are working very well. Making the modifications as shown on the attached <br /> drawing would allow the driveway to continue to be used to serve the drop off box.The driveway will not serve the new <br /> parking lot. <br /> 0 _ ..e, November 13, 2018 <br /> Jarr'chardson Date <br /> Hall County :.. it <br /> November 13, 2018 <br /> Brian Rasmussen Date <br /> Bigzby's, Inc. Page 1 of 2 <br />