My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/02/2018
LFImages
>
County Clerk
>
Board Minutes & Agendas
>
Board of Commissioners
>
Agendas & Minutes
>
Prior Years
>
2018
>
10/02/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2019 6:26:42 PM
Creation date
2/8/2019 10:07:43 AM
Metadata
Fields
Template:
Marriage License
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HALL COUNTY Change Order No: 001 <br /> IContract Change Order I Date: 1012!2018 <br /> County Project Number: 2018 Hall County Administrattion Building Parking Lot Replacement <br /> Change Order Description: Reduce the island width from 22.65 feet to 10,62 feet and <br /> place 6"colored imprinted concrete surfacing on the median. <br /> Contractor: Bigzby's, Inc. <br /> Letting Date: August 21, 2018 <br /> Contract Award Date: August 21, 2018 <br /> Contract Amount before Change Order $245,310.06 <br /> Original Revised Change <br /> Item Unit of Contract Contract Bid Order Amount of Change <br /> # Item Description Measure Quantity Change Quantity Price Price <br /> Square <br /> 17 Install 6" Concrete Pavement yards 3,589 98 0 $ 36.54 N.A. $ 3,580.92 <br /> 18a Install 6"Colored Stamped Concrete Square 0 765 765 N.A. $10.00 $ 7,650.00 <br /> Median Surfacing Feet <br /> 24 Install 4" Conduit for Irrigation Lineal 436 -70 366 $ 20.00 N.A. $ (1,400.00) <br /> Foor <br /> Total for Change Order: I $ 9,830.92 <br /> Revised Contract Amount after Change Order: $ 255,140.98 <br /> Change Order Narrative <br /> The median in the north portion of the parking lot is being narrowed down from 22.65 feet wide to 10.62 feet wide, <br /> resultiing in an increase in the quantity of 6" concrete pavement for the parking lot. <br /> The median is to be surfaced with 6"colored stamped concrete median surfacing. <br /> Eliminating the landscaping in the median will reduce the amount of conduit needed for irrigation lines. <br /> ` <br /> OP , ,c e0C2S- -<w` October 2, 2018 <br /> Jane t -o 3 ds9n Chair <br /> Hall County -o Date <br /> ll/l Fd <br /> c-32.- A� + a October 2, 2018 <br /> ,.�.� ?_tom-.,--az. - <br /> Brian Rasmussen Date <br /> Bigzby's, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.