Laserfiche WebLink
Consultant Work Order <br /> (Local Projects) <br /> Prq•a aloe: Cosa tea: <br /> BRO-7040(25) 42322 <br /> kxnaaet fan.aidRrpe.►4ra.) Agreement Nor: Work sae tore: <br /> Febfwro Hon&Ul evla(FHU) 8X1347 2 <br /> LPA Ain ann p v.) Gant.Change Otte Nw:rieco a me <br /> Hail County!Stew Retie rife <br /> A6 pause agree the following dumbed work needs to be cottoned by the consultant as part of the referenced project. <br /> A6 panties concur and hereby give notice to proceed based on the following: justification to modify contract,scope of <br /> services,deay.abW,schedule,and estimated total fee.All ether terra of existing prune between the parties are <br /> still In effect It S understood by ae parties tat the work dented herein we become pat of a future supplement to the <br /> agreement Indicated above. <br /> JW_Na_tamoOS...emit(OAS...p d ren4:ww donee b art sscheaar) <br /> The Categorical Exclusion for Grand Island NW was approved Apr9 25,2018. During the dgM-of-way(ROW) <br /> process a field entrance was added. The permanent ROW and temporary easement amounts were also <br /> updated. The field entrance and new ROW amounts w it need to be evaluated by the NDOT POS personnel and <br /> dcaananted in the NOOT Re-evaluation Rom^. The Green Sheets we need to be updated and rerouted. <br /> Work Tilt Summary of F.. <br /> A. Total Dint tabor Cost 1,153.92 <br /> Re-evaluation of approved Categorical Exclusion,ed a Overhead(Factor'x A) 1,932.93 <br /> rerouting ot Green Sheets. C. A+B 3,088.85 <br /> D. Proffers.(Factor"x C) 412.09 <br /> *Overhead Factor. 18751% E. Direct Non-Labor Cat 0.00 <br /> "Profit/Fee Factor._ 13.35% F. Suboonsultant Services 0.00 <br /> Total F..Hots TOTAL FEE: C+D+E+F a 53,49 .55 <br /> ❑ ESTIMATED TOTAL FEE: $3,49836 <br /> ❑ FINAL TOTAL FEE 53,498.55 <br /> Work Order Authorization—May be granted by email and attached to this document. <br /> Consultant �A� <br /> ��.. . Hama r3La 7'(.�i y ZStens G�Daft will M to granted by <br /> LP0.` j , a a 1 email by <br /> _ i r • r ta,J-d8-21 PrefuMary. <br /> wm. <br /> DWI Engineering& <br /> LPS PC(tor Preliminary End ^ Rep.[for CerwM>ethn Engineering) CD PC for <br /> 1 Construction <br /> SteveM P {Z.k Ether I A1_. of 2-0e- q Engineering. <br /> Neme Asset r. Date <br /> LPS Unit Head Review(tor PE Phase) <br /> SU all.. <br /> t.PS keen or Construction Engineer(Construction Phase). <br /> teems sips. P.S. <br /> FHWA: (PHWA Approve/on Put Oversight Pmjeat.Only, f/-icebto Proaa$Dm: <br /> Nom. Spam Oat / « /�f,� <br /> b1.b16utlen: Cos LPA-RC. SW*Re, RavA LPS PC. Noon Aeuon Engineer. NNh.ay a Meaee.j7 CO <br /> DR Form 250,Maneh 2014 <br /> EXHIBIT`B' <br /> Page 1 of7 <br />