Laserfiche WebLink
iNfro4 MICHAEL <br /> 6/13/2018 <br /> OPINION OF PROBABLE CONSTRUCTION COSTS <br /> BRO-7040(25)CN 42322 <br /> HALL COUNTY <br /> Kirkham Michael MONITOR ROAD OVER PRAIRIE CREEK <br /> Omaha,NE 100'x 30'CONTINUOUS CONCRETE SLAB BRIDGE <br /> TOTAL ESTIMATED QUANTITIES <br /> ITEM <br /> NO. CODE NO. ITEM UNIT QUANTITY PRICE TOTAL <br /> Group 1-Grading Items <br /> 2 0030.10 Mobilization LS 1 <br /> 1 1009M General Clearing and Grubbing LS 1 - <br /> i 2 4045.00 Remove Structure at Sta 32-89 EA 1,00 <br /> 3 1030.00 Earthwork Measured in Embankment CY 1147 <br /> 4 P300.16 18"Driveway Culvert Pipe,Type 3,4 or 5 LF 31 . <br /> 5 4310.18 18"Metal Flared-End Section EA 2 <br /> 6 9111.00 Water MGAL 24 _ <br /> 7 L019.11 Erosion Control,Class 1B SY 2251 <br /> 8 L019.13 Erosion Control,Class 1D SY 1.619 <br /> 9 L022.11 Fabric Sift Fence,High Porosity LF 097 <br /> Group 2-Traffic Items <br /> 1 0005.10 Traffic Control LS 1 <br /> Group 3-Surfacing Items . <br /> 1 0030.30 Mobilization LS 1 <br /> 2 2001.00 Gravel Surface Course CY 126 <br /> 2 2009.10 Gravel Embedment SY 1498 <br /> 3 9170.00 Earth Shoulder Construction STA 9.5 <br /> 4 9173.20 Sub9rade Preparation 5Y 1498 _ <br /> I Group 6-Bridge Items <br /> 1 0030.06 Mobilization LS 1 <br /> 2 6000.10 Abutment No 1 Excavation LS 1 _ <br /> 3 6000.20 Bent No.1 Excavation LS 1 _ <br /> 4 6000.21 Bent No.2 Excavation LS 1 <br /> 5 8000.11 Abutment No.2 Excavation LS 1 <br />• 6 6010.22 Class 478-3000 Concrete for Bridge CY 93.9 _ <br /> 7 6010.26 Class 47B-4000 Concrete for Bridge CY 183.4 <br /> 8 4159.55 Epoxy Coated Reinforcing Steel LB 53800 <br /> 9 5200.00 Concrete Piling LF 1700 <br /> 10 6080.00 Structural Steel for Substructure LB 2210 <br /> 11 6081.00 Structural Steel for Superstructure LB 450 <br /> 12 6310.00 Steel Sheet Piling SF 3520 <br /> 13 6105.02 Rock Riprap,Type B TON 455 <br /> 14 1043.50 Riprap Filler Fabric SY 573 <br /> 15 6006.56 Bridge Deck Grooving SY 270 <br /> Group 7-Guardrail Items <br /> 1 7011.20 W-Beam Guardrail LF 78.3 _ <br /> 2 _ 7020.00 Bridge Approach Section EA 4 <br /> 3 7024.27 Guardrail End Treatment Type II EA 4 <br /> TOTALS 1 <br /> THE OPINION OF PROBABLE CONSTRUCTION COST IS NOT A GUARANTEE OF A BID THAT WILL BE RECEIVED FROM A CONTRACTOR. IT IS <br /> INTENTED BE USED FOR COMPARISON,PROJECT PLANNING,AND BUDGETING. THE TOTAL SHOULD BE ADJUSTED TO REFLECT INFLATION. <br /> opc.xlsm <br />