My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/24/2018
LFImages
>
County Clerk
>
Board Minutes & Agendas
>
Board of Commissioners
>
Agendas & Minutes
>
Prior Years
>
2018
>
07/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2019 1:41:54 PM
Creation date
2/7/2019 2:16:03 PM
Metadata
Fields
Template:
Marriage License
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HALL COUNTY HIGHWAY DEPARTMENT <br /> 4 2900 WEST 2nd ST, GRAND ISLAND, NE 68803-5263 <br /> ' ' ` www.hallcountyne.gov <br /> PHONE: (308) 385-5126 FAX: (308) 381-6486 <br /> f <br /> r <br /> Steven P.Riehle,P.E. <br /> County Engineer/Highway Superintendent <br /> �i'P Q+�� stever@hallcountyne.gov <br /> p ,fib <br /> July 19, 2018 <br /> Summary of County Board Agenda Item <br /> Consideration of approval of PS&E package and authorizing board chair to sign <br /> resolution approving PS&E package for the bridge on Monitor Road south of White <br /> Cloud Road under federal aid project number BRO-7040(25). <br /> Background <br /> Hall County has been working with the Nebraska Department of Transportation (NDOT) <br /> on this project since 2011. The existing pony truss bridge was built in 1935 across <br /> Prairie Creek. The existing bridge is fracture critical, weight restricted at 9 tons, and is <br /> structurally deficient. The construction contract will include right-of-way acquisition, <br /> removal of the existing bridge, channel work, construction of a cast-in-place concrete <br /> slab bridge, concrete bridge railings, approach guardrails, and grading of the roadway. <br /> Discussion <br /> The environmental and design phases of the project are virtually complete. The <br /> NDOT wants to allocate the federal funds to this particular project yet this federal <br /> fiscal year. If Right-of-Way negotiations are successful, they hope to open bids in <br /> October and start construction this winter. <br /> The total project cost is estimated at $856,000. The project is being funded with federal <br /> aid, state-aid bridge funds, soft match bridge funds and an estimated county share of <br /> under $14,000. The estimate for the construction contract is confidential till after the bid <br /> letting, and thus is blacked out on any attachments. <br /> Recommendation <br /> Approve the PS & E package and authorize the chair to sign the resolution. <br /> Steven P. Riehle <br /> Hall County Engineer/ Highway Superintendent <br /> Attachments: NDOT PS & E Package <br /> Resolution approving PS & E package <br />
The URL can be used to link to this page
Your browser does not support the video tag.